Laserfiche WebLink
RECEIVED <br />9. SECONDARY PIPE TESTING <br />MA7' 0 6 2014 <br />Test Method Developed By: X Piping Manufacturer Industry Standard <br />���� <br />LlOther (Specie) �V WIRVI <br />HE <br />Test Method Used: X Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Spec) <br />t Euipment Used: Pressure Gauges in Psi/Nitrogen <br />Piping Run #5 Piping Run #6 <br />TerLength <br />Equipment Resolution: <br />Piping Run # 7 <br />1/10-15 Psi <br />Piping Run # 8 <br />aterial: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />anufacturer: <br />Smith <br />Smith <br />Smith <br />Smith <br />iameter: <br />4" <br />4" <br />3" <br />3" <br />f Piping Run: <br />Approx. 12' <br />Approx. 12' <br />Approx. 270' <br />Approx. 30' <br />Product Stored: <br />Diesel Siphon <br />Diesel Manifold <br />Diesel auto island <br />Regular Siphon <br />Method and location of <br />piping -run isolation: <br />Test boot at STP #I & <br />STP #2 <br />Test boot at STP #I & <br />STP #2 <br />Test boot at STP #2 <br />& UDC's 17,18,19,& 20 <br />Test boot at STP #3 & <br />Piping Sump #9 <br />Wait time between applying <br />ressure and startingtest: <br />10 Minutes <br />10 Minutes <br />10 Minutes <br />10 Minutes <br />Test Start Time: <br />2:20 <br />2:40 <br />2:05 <br />1:25 <br />Initial Reading (RI): <br />5 Psi <br />5 Psi <br />5 Psi <br />5 Psi <br />Test End Time.. <br />3:20 <br />3:40 <br />3:05 <br />2:25 <br />Final Reading (RF): <br />5 Psi <br />5 Psi <br />5 Psi <br />5 Psi <br />Test Duration: <br />I Hour <br />1 Hour <br />I Hour <br />1 Hour <br />Change in Reading (RF -R,): <br />0 Psi <br />0 Psi <br />0 Psi <br />0 Psi <br />Pass/Fail Threshold or <br />Criteria: <br />No Loss in Psi <br />No Loss in Psi <br />No Loss in Psi <br />No Loss in Psi <br />Test Result: <br />Pass <br />Pass <br />Pass <br />Pass <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />