My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
13521
>
2800 - Aboveground Petroleum Storage Program
>
PR0527727
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2019 4:51:47 PM
Creation date
10/19/2018 4:55:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0527727
PE
2832
FACILITY_ID
FA0001457
FACILITY_NAME
COLLEGEVILLE MARKET & CAFE
STREET_NUMBER
13521
Direction
E
STREET_NAME
MARIPOSA
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
18306007
CURRENT_STATUS
01
SITE_LOCATION
13521 E MARIPOSA RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County <br />Environmental Health Department <br />1868 East Hazelton Avenue, Stockton, California 95205-6232 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sjgov.org/ehd <br />Aboveground Petroleum Storage Act Inspection Report <br />Facility Name: <br />Facility Address: <br />1 <br />Date: <br />COLLEGEVILLE MARKET & CAFE <br />13521 E MARIPOSA RD, STOCKTON <br />January 11 2016 <br />SPCC Plan Requirements for Onshore Facilities (excluding production facilities) <br />723 <br />CFR 112.8(d)(1) <br />Failed to provide corrosion protection for buried piping <br />■ V ❑ R ❑ COS <br />724 <br />CFR 112.8(d)(2) <br />Failed to cap/blank-flange connection at transfer point and mark its origin if not in service <br />i V ❑ R ❑ COS <br />725 <br />CFR 112.8(d)(3) <br />Failed to design pipe supports to minimize abrasion/corrosion and to allow for expansion/contraction <br />❑ V ❑ R ❑ COS <br />726 <br />CFR 112.8(d)(4) <br />Failed to regularly inspect aboveground valves, piping, and appurtenances <br />■ V ❑ R ❑ COS <br />727 <br />CFR 112.8(d)(4) <br />Failed to conduct integrity and leak test on buried piping any time it is worked on <br />❑ V ❑ R ❑ COS <br />728 <br />CFR 112.8(d)(5) <br />Failed to adequately warn vehicles entering facility to protect piping and other transfer operations <br />❑ V c R r- COS <br />Other Violations <br />4010 <br />See below <br />Unlisted Administration/Documentation violation <br />❑ V u R ❑ COS <br />4020 <br />See below <br />Unlisted Training violation <br />❑ V ❑ R ❑ COS <br />4030 <br />See below <br />Unlisted Operations/Maintenance violation <br />u V ❑ R ❑ COS <br />4040 <br />See below <br />Unlisted Release/Leaks/Spills violation <br />❑ V ❑ R c COS <br />SUMMARY OF VIOLATIONS <br />(CLASS I, CLASS II, or MINOR - Notice to Comply) <br />Item # <br />Remarks <br />301 <br />CFR 112.5(a) Failed to amend Plan as necessary. <br />The SPCC Plan did not include three 55 gallon gasoline drums, which are now being stored on site, stored both next <br />to the fuel tanks and behind the convenience store, the Plan states "there are no mobile or portable ASTs." Section <br />3.7.1 states that inspections include "verifying that the berm drain valve is securely closed", however, a later section <br />states "there are no berms at this facility. The Plan includes a list of spill equipment stored in "the maintenance <br />building", no maintenance building was observed on site and the site did not have all of the equipment listed. The Spill <br />Prevention, Control, and Countermeasure (SPCC) Plan must be amended when there is a change in the facility <br />design, construction, operation, or maintenance that materially affects its potential for a discharge, within 6 months of <br />the change, and implemented as soon as possible, not later than 6 months following preparation of the amendment. <br />Immediately make all necessary amendments to the SPCC Plan to accurately represent the procedures and policies <br />currently in place at the facility. <br />This is a minor violation. <br />302 <br />CFR 112.5(b) Failed to review Plan once every five years and/or implement any resulting amendments. <br />The Spill Prevention, Control, and Countermeasure (SPCC) Plan was dated 9/8/10. According to the SPCC Plan, the <br />5 year review was due on 9/6/15. A review and evaluation of the SPCC Plan must be conducted at least once every 5 <br />years. As a result of this review and evaluation, the SPCC Plan must be amended within 6 months of review, and <br />recertified by a Professional Engineer if any technical amendments were made. Immediately conduct a review of the <br />facility SPCC Plan and make any necessary amendments. <br />This is a Class II violation. <br />Received <br />Inspector: <br />Phone: <br />Date: <br />(initial):STACY <br />RIVERA, Senior REHS `� <br />(209) 468-3440 <br />01/11/2016 <br />'Z Page 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.