My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
A
>
11
>
3500 - Local Oversight Program
>
PR0543358
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2018 9:03:39 AM
Creation date
10/22/2018 8:48:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0543358
PE
3528
FACILITY_ID
FA0005977
FACILITY_NAME
TRI VALLEY GROWERS PLANT K
STREET_NUMBER
11
Direction
S
STREET_NAME
A
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15304003
CURRENT_STATUS
02
SITE_LOCATION
11 S A ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.0 SOIL BORINGS <br /> 5.1 General <br /> 5.2 Position of the Borings <br /> 5.3 Soil Sampling and Analyses <br /> 5.5 Boring Logs <br /> !L <br /> 5.6 Disposition of Soil Boring Cutting <br /> 5.7 Soil Sampling <br /> 6.0 QUALITY ASSURANCE <br /> 6.1 Chain of Custody <br /> 6.2 Cross Contamination Prevention <br /> 7.3 Sample Analysis and Detection Limits <br /> 8.0 HEALTH AND SAFETY PROGRAM <br /> 8.1 Workers Health and Safety <br /> 8.1.1 Work Space Safety <br /> 8.1.2 Skin and Head Protection <br /> 8.1.3 Face and Respiratory Protection I <br /> 8.2 Health and Safety Agencies 11 <br /> 4.0 QUALITY ASSURANCE PROGRAM <br /> it <br /> The following measures will be taken to ensure that a high quality study is <br /> i� <br /> conducted and that cross contamination is prevented. <br /> 4.1 Equipment <br /> ii <br /> Samples will be collected in individual boring tubes to prevent <br /> contamination. <br /> 4.2 Cross Contamination Prevention <br /> All soil sampling equipment will be thor6ughfy cleaned before use. <br /> Gloves will be worn while samples are collected',and changed between <br /> samples, if appropriate. <br /> Work Plan Page 4 <br /> Custom Food Machinery <br /> July 1, 1992 <br />
The URL can be used to link to this page
Your browser does not support the video tag.