Laserfiche WebLink
1 <br /> y <br /> i1 <br /> T7 U <br /> ATC p SITE SAFETY PLAN <br /> Job Name: Ripon Unified School District ii <br /> i <br /> Job Location: 304 North Acacia Avenue, Ripon, California ' <br /> 11 Client Name: Ripon Unified School District <br /> Project Number: 13099.0001 j <br /> General Work Description: Preliminary Site Investigation <br /> SSP Prepared by: Drew Van Allen <br /> 3i <br /> On-site Safety Officer: Tom Luttermanj� <br /> Project Safety Officer: Jeanne Homsey <br /> This site health and safety plan (SSP) must be kept o lLsite and accessible to all on-site <br /> employees during all phases of site operations. The SSP must be reviewed and signed by all on- <br /> site employees, subcontractors, and visitors prior to ente1nng the site. General safe work <br /> practices are identified in the ATC Associates Inc.'s Injury and Illness Prevention Manual and y <br /> apply to all ATC work sites. <br /> The provisions set-forth in this SSP shall apply to ATC employees and any subcontractors <br /> working for ATC at the job site. All personnel working for"ATC 'at the job site must read this <br /> SSP, and sign the attached Compliance Agreement before entering the work area. Field <br /> personnel may deviate from the safety provisions set-forth i,,t this 3 SSP, but only to upgrade or <br /> increase the safe requirements. ATC personnel may sus end work if unsafe working <br />{ safety N y 1' , g <br />} conditions are identified or observed,or unauthorized modifications to the safety provisions set- <br /> forth in this SSP are made. If changes in site or working conditions require changes in safety <br /> procedures, appropriate amendments to this SSP will be provided by the ATC project manager <br /> or supervisor,with the written approval of a ATC project safety officer or the ATC Health and <br /> Safety Director. <br /> 't <br /> PAGE 3 <br /> 3 <br /> A <br /> �s <br />