Laserfiche WebLink
I� <br /> I , <br /> I <br /> i� <br /> ATC SITE SAFETy pI AN <br /> �1 f <br /> ;3 <br /> 1 <br /> I <br /> I j <br /> Physical Hazards <br /> Tasks} Hazardli0gaton Measure l <br /> Heavy Equipment(Noise& Physical All heavy equipment used on this project will <br /> contact) be in good working order and operated in <br /> accordalnce with recognized industry standards <br /> and Cal.,,OSHA Title 8, Subchapter 4, <br /> Constrtion Safety Orders. In addition, an <br /> exclusion zone applies to all personnel. The <br /> exclusion zone will be 20 feet to the front and <br /> either sl6e of the operating drill rig. Personnel <br /> will not be allowed under booms or augers at <br /> any time. <br /> All equipment operators and ground crews <br /> working in close proximity of heavy equipment <br /> will be supplied with ear protection. <br /> ;I <br /> I1 <br /> I <br /> 3 <br /> I! <br /> I ]j <br /> Il <br /> 1 <br /> 2 I� <br /> I <br /> i <br /> i{ <br /> I1, <br /> I I� <br /> I� <br /> T <br /> I I <br /> PAGE 6 I# <br /> q <br /> is <br /> i <br />