My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ACACIA
>
304
>
3500 - Local Oversight Program
>
PR0543359
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2018 10:18:17 AM
Creation date
10/22/2018 9:49:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0543359
PE
3528
FACILITY_ID
FA0000733
FACILITY_NAME
RIPON USD-MAIN KITCHEN
STREET_NUMBER
304
Direction
N
STREET_NAME
ACACIA
STREET_TYPE
AVE
City
RIPON
Zip
95366
APN
25904005
CURRENT_STATUS
02
SITE_LOCATION
304 N ACACIA AVE
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATC Associates Inc. <br /> Quality Assurance/Quality Control Plan <br /> j` Revised 1998 <br /> Prior to arriving at the sample site, the drill rig/augers will be steam cleaned and all sample <br /> equipment will be cleaned. Cleaning will be conducted on-site on all sampling equipment <br /> I; <br /> between each sample interval. 1 <br /> Soil samples will be obtained using a California modified split=spoon sampler containing three <br /> 6-inch long, 2-inch diameter brass tubes. The sampler.will be driven 18-inches ahead of the <br /> hollow stem auger by a 140-pound hammer with a 30-ir,ch drop in accordance with American <br /> r <br /> Society for Testing and Materials(ASTM)Methods D 11 586-84 for split barrel sampling of soil <br /> and D 1587-83 for thin-walled tube sampling of soils. The blows required to drive the sampler <br /> IL <br /> each 6-inch interval will be recorded on the boring log. ;The sampler will be removed from the <br /> boring and opened to reveal the brass tubes. The bottom tube will be sealed with aluminum <br /> I� <br /> foil or teflon tape and plastic end caps, taped and labeledlwith the following information: <br /> U date and time <br /> ii project ID <br /> ii sample IDl <br /> ii name of sampler <br /> i9 type of analysis to be performed I <br /> II� <br /> This sample will be immediately placed into a cooler containing dry ice or frozen chemical ice. <br /> i I <br /> A "high-low" temperature recording thermometer will ac company sample shipments to ensure <br /> I� I <br /> proper temperature maintenance. The samples will be delivered to a state certified laboratory <br /> following under chain-of-custody protocol within 48 hours of sampling,whenever possible. <br /> I� <br /> .; <br /> Soil in the uppermost brass tube will be described according to ASTM standard practice for <br /> E <br /> description and identification of soils (ASTM D-2488=84). Stratigraphic, genetic and other <br /> Ii <br /> data/interpretations will also be recorded. Soil properties may also be determined from the <br /> middle brass tube and from the sampler shoe. Alternatively the second sample tube may be <br /> l <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.