My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0004079
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
2449
>
3500 - Local Oversight Program
>
PR0543823
>
ARCHIVED REPORTS XR0004079
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2018 1:13:35 PM
Creation date
10/22/2018 10:39:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS XR0004079
FileName_PostFix
XR0004079
RECORD_ID
PR0543823
PE
3528
FACILITY_ID
FA0003760
FACILITY_NAME
SUNWEST LIQUORS
STREET_NUMBER
2449
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95242
APN
02741005
CURRENT_STATUS
02
SITE_LOCATION
2449 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Summary <br /> • The only groundwater remediation system that will meet the requirements to remove MTBE as while <br /> as Benzene is an Activated Carbon Filter system. Activated Carbon filtration was proven successful to <br /> non detect levels for all organic compounds during the ATC pump test. <br /> ..,. � .� r � t� <br /> A iotttal recharge replacement of tine groimdwaier tit the coli wart mated aq-tliaer is abou1,50,0010 gallons. <br /> At a 12 gpm pumping and filter Tate,29 days would be required to remove the contaminated groundwater <br /> at 100%efficiency. The last monitoring event indicated that only MW#3 is contaminated with MTBE <br /> and only GMX-1 is contaminated with Benzene. Mw#4 was not contaminated. If qualitites and <br /> assumptions hold as estimated,the project should be completed in 30 to 45 days. <br /> Please approve this work plan at your earliest convenience, so inai the work make be completed in a <br /> timely manner.If you have any questions on the work plan please call Ervin Rifenburg at 2091368-9381. <br /> Respectfully submitted, <br /> Foothill gi �4° JklHN8V <br /> - n <br /> Ervin Rifen nurg;s PE <br /> { <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.