Laserfiche WebLink
MONITORING WELL SAMPLE EVENT OF 06/11/02 FINDINGS AND RECOMMENDATIONS <br /> . Sampling Procedure <br /> On June 11, 2002, Del-Tech Geotechnical Services, under the supervision of Foothill Engineering <br /> Performed a quarterly sample event. Marcel Delacruz of the Caltrans was notified of the sample event <br /> on June 9,2002 as required by Caltrans Permit No,1002-6NV-0218. Monitoring wells were vented and <br /> Purged by standard of the industry methods (see Groundwater Field Report by Del-Tech Geotechnical <br /> Services, attached). Purge rates were 0.5 gal/min. Groundwater samples were extracted from each <br /> monitoring well using the Waters Inertia Pump technique with dedicated sample tubes. Samples were <br /> transported on ice for delivery under chain of custody to GeoAanalytical Laboratories for analysis. The <br /> new extraction well was also sampled and that sample analysis is part of this report. <br /> Sample Analysis <br /> Water samples were analyzed by EPA methods 802113 for BTEX,5030/Luft for TPHg,and EPA 8260B <br /> for Oxygenates. Results of all sample analyses are attached in the original laboratory form and in recap <br /> form. <br /> Findings From Water Sample Analysis <br /> The plume concentration has changed from the last sampling event.MTBE concentrations in monitoring <br /> well GMX-1 have dropped from 38 ug/L on the last event to non-detect on this event. The only <br /> monitoring well above the non-detect level for MTBE is MW-3 with 2.9 ug/L. The major changes in <br /> TPHg has occurred in extraction well EW-1 with TPHg raising from 2.1 mg/L to 14 mg/L <br /> The groundwater surface has raised about +/- 2' from the last event (see Del-Tech Field Report, <br /> ienclosed). The groundwater hydraulic gradient is to the south at a slope of S=0.002. <br /> Conclusions <br /> MTBE above detectable levels only occurred in monitoring well MW-3. During last sampling event <br /> MTBE was detected in only monitoring wells GMX-1 and MW-3. Groundwater elevations have risen <br /> from the last event about two feet,which is very similar to the same quarter last year. The water sample <br /> analysis for monitoring well GMX-1, MW-2 and the extraction well EW-1 continue to produce low <br /> levels of TPHg(see Water Sample Analysis Recap attached). <br /> Recommendations <br /> Quarterly groundwater monitoring should continue as in the past.A Final Remedial Plan has been mailed <br /> to your office that recommends a"Pump and Treat"reclamation plan for the contaminated groundwater. <br /> Please review that Final Remedial Plan at the earliest date so that this work can proceed. <br /> Please contact Ervin Rifenburg of this office (209/368-93 81) if any questions arise concerning this <br /> Report. <br /> OQROFESS/pN9 <br /> Respectfully sub i a RIF�Nd �0 <br /> - . <br /> Foothi gi enn <br /> Gym y - <br /> Exp, � <br /> is Ervin Rife urg, P <br /> OFC <br /> cc: Diana Maragos,Attorney for est Liquors, W. T. Mitchell Group <br /> 2 <br />