Laserfiche WebLink
continue for an additional two quarters.Three data points for each monitoring well will give enough data <br /> for the design of any future reclamation plan. After three data points have been collected, a soil and <br /> ground water reclamation plan should be designed if required by the PHS/EHD. <br /> It is very puzzling that the connecting source of this gasoline contamination in the groundwater has not <br /> been discovered. The seven soil borings to groundwater and five push bores did not intersect the path of <br /> the soil contamination plume. It is recommended that no further soil boring be made and that the <br /> southwest corner of the tank excavation be considered the source of the contamination. If any future soil <br /> boring is required by the PHS/EHD, it should be located in that area. <br /> Please contact Ervin Rifenburg of this office (209/368-9381) if any questions arise concerning this <br /> Report. <br /> Respectfully submitted, <br /> Fo ill ginee <br /> ruin if , R <br /> cc: Diana Maragos, Attorney for Sun West Liquors <br /> cc: Geomatrix, Mike Keim FAX 510/663-4141 <br /> 3 <br />