My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ACAMPO
>
4579
>
3500 - Local Oversight Program
>
PR0543361
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2018 2:06:16 PM
Creation date
10/22/2018 1:31:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0543361
PE
3528
FACILITY_ID
FA0003573
FACILITY_NAME
A & M MARKET*
STREET_NUMBER
4579
Direction
E
STREET_NAME
ACAMPO
STREET_TYPE
RD
City
ACAMPO
Zip
95220
APN
01703053
CURRENT_STATUS
02
SITE_LOCATION
4579 E ACAMPO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Addendum to Work Plan October 9, 1992 <br /> A & M Market, Acampo, California QEC 92-120-1W.ADD <br /> water surface. The ground-water surface his estimated to be about 60 feet <br /> below grade based on information provided by San Joaquin County personnel. <br /> • Collect relatively undisturbed soil samples at 5-foot intervals and classify soil <br /> samples according to the Unified Soil Classification System. <br /> • Submit selected soil samples to a State-certified laboratory and analyze them <br /> for TPHg and BTEX using modified Environmental Protection Agency(EPA) <br /> Methods 8015 and 8020, respectively. We anticipate that two soil samples <br /> collected from each boring will be chemically analyzed. We will evaluate in <br /> the field the need to analyze additional samples. <br /> • Interpret field and laboratory data to evaluate the lateral and vertical <br /> extent of hydrocarbons in soil below the former tanks. <br /> i <br /> • Prepare a report outlining our methods, procedures, and findings, and <br /> evaluating and recommending appropriateremedial.actions. <br /> Additional work will be performed under the direction of Ms. Gillian S. Holmes, a <br /> registered Geotechnical Engineer (G.E. 2023) in the Sate of California, and Mr. Barry <br /> Marcus, Senior Geologist. Please call if you have any questions regarding the work outlined <br /> in this Work Plan. <br /> ii <br /> Sincerely, <br /> Quorum Environmental Consultants, Inc. <br /> Barry Marcus <br /> Senior Geologist i <br /> Attachments: Plate 1, Site Vicinity Map j <br /> Plate 2, Generalized Site Plan <br /> Field Procedures _ <br /> ii <br /> ii <br /> i <br /> !I _ <br /> J <br /> A <br /> I <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.