My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ACAMPO
>
4579
>
3500 - Local Oversight Program
>
PR0543361
>
ARCHIVED REPORTS XR0000022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2018 2:12:05 PM
Creation date
10/22/2018 1:35:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS XR0000022
FileName_PostFix
XR0000022
RECORD_ID
PR0543361
PE
3528
FACILITY_ID
FA0003573
FACILITY_NAME
A & M MARKET*
STREET_NUMBER
4579
Direction
E
STREET_NAME
ACAMPO
STREET_TYPE
RD
City
ACAMPO
Zip
95220
APN
01703053
CURRENT_STATUS
02
SITE_LOCATION
4579 E ACAMPO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Report on Subsurface Environmental Exploration (Soil Borings) Page 2 <br /> A & M Market, 4579 East Acampo Road, Acampo, California November 9, 1992 <br /> Quorum Environmental Consultants, Inc., Project 92-120-2 <br /> We have concluded that additional removal of hdrocarbon-bearin soil should be <br /> Y 9 <br /> performed by excavation in the west side of the cavity and extending west to the soil <br /> borings B-2 and B-3 l A ramp should be constructed for equipment access, and the work <br /> should be performed quickly because localized soil may slough, the work must be done <br /> during the rainy season, and the Client wishes to return the site to full operation The soil <br /> should be aerated and used to backfill the excavation when hydrocarbons have been <br /> reduced to acceptable levels <br /> 2.0 SCOPE OF SERVICES <br /> The purpose of this phase of work at the A & M Market was to continue delineation of <br /> gasoline contamination in the subsurface soil Sav-Mor Oil Company requested the work <br /> because hydrocarbons were encountered in soil during removal of three underground <br /> storage tanks from the subsurface of the site Accordingly, the following scope of <br /> services,which was described in the Work Plan (see References) dated July 3, 1992, and <br /> which is strictly limited to the items listed below, was completed for this phase of the <br /> project The work actually performed is described in the text, and standard protocols for <br /> field and laboratory procedures are discussed in Appendix C <br /> The reported work included the following tasks <br /> 1 Obtaining the necessary authorization from representatives of the appropriate <br /> agencies to proceed with this scope of services <br /> 2 Acquiring the appropriate permit from the San Joaquin County Public Health <br /> Services, Environmental Health Division, for advancing soil bonngs onsite <br /> 3 Notifying Underground Services Alert at least 48 hours prior to drilling to identify <br /> public utilities at the site <br /> 4. Planning necessary safety equipment and procedures and implementing a site- <br /> specific Safety Plan for field work <br /> 5 Observing the drilling of four soil borings to a depth of approximately 40 feet below <br /> the existing ground surface or until two consecutive samples showed no indication <br /> of hydrocarbon contamination. The maximum depth of the borings was to be the <br /> ground-water surface This was estimated to be 60 feet below grade based on <br /> information provided by Sari Joaquin County personnel The four soil borings <br /> designated B-1 through B-4 were to be drilled next to the tank cavity on the north, <br /> west, and south sides where hydrocarbons had been identified in the soil in <br /> previous studies <br />
The URL can be used to link to this page
Your browser does not support the video tag.