My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AD ART
>
3330
>
3500 - Local Oversight Program
>
PR0543840
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2018 3:08:22 PM
Creation date
10/22/2018 2:31:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0543840
PE
3528
FACILITY_ID
FA0003825
FACILITY_NAME
CALIFORNIA HIGHWAY PATROL #265*
STREET_NUMBER
3330
Direction
N
STREET_NAME
AD ART
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
3330 N AD ART RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• SITE-SPECIFIC HEALTH AND SAFEQLAN �f SSHP <br /> SITE INVESTIGATION AND REMEDIATION DESIGN 06/13/00 <br /> URS Greiner Woodward Clyde,Inc. Page 2 <br /> RESD Contract No.3014214 <br /> A. SITE INFORMATION <br /> Project Name: RESD Site Investigation and Remediation Design(SURD) <br /> Project Number: 41-03014214.03.02000 <br /> Location: 3330 North Ad Art Rd. Stockton,CA <br /> Client: California Real Estate Services Division (RESD) <br /> SHSP Prepared By: Phil Cox Date: 06/13/00 <br /> Project Start Date: June 20, 2000 <br /> B. SITE DESCRIPTION (8 CCR§5192[C][41) <br /> Facility History: Four borings were installed in March 1999 surrounding. the gasoline <br /> UST. Four soil samples were analyzed for TPH-GIBTEXIMTBE. TPH- <br /> 6 and BTEX were ND. MTBE was detected between 0.008 and 0.007 <br /> mg/kg- <br /> General Site Description: The site is generally flat and paved with asphalt or concrete. It is <br /> currently occupied by the CHP. <br /> C. PROJECT OBJECTIVES (8 CCR§5192[C][4][B]) <br /> Description of Work <br /> Activities Planned: Drill four soil borings and collect soil and groundwater samples. The <br /> borings will be drilled to a total depth of approximately 60 feet bgs. The <br /> drilling method will be hollow stem auger. <br /> D. PROJECT ORGANIZATION (8 CCR§5192[B][21) <br /> ✓ Responsibility Training <br /> (check if (see HSP Section 3.0 for (see HSP Section 8.0 for training <br /> Team Member assigned) personnel responsibilities) requirements) <br /> Project Manager(PM) 40-hr.H&S (HAZWOPER)Training <br /> Phil Cox Site Safety Coordinator(SSC) 8-hr H&S Refresher(exp.10/07100) <br /> H&S Supervisor Training <br /> SSC-Designee 40-hr.H&S (HAZWOPER)Training <br /> Peter Crispell Geologist 8-hr H&S Refresher(exp.7114/00) <br /> H&S Super isor Training <br /> Geologist 40-hr.H&S (HAZWOPER)Training <br /> Steve Ball SSC-Designee 8-hr H&S Refresher(exp.2116/00) <br /> Field Technician H&S Supervisor Training <br /> FirstAidICPR(exp. 11/05/00) <br /> Geologist 40-hr.H&S (HAZWOPER)Training <br /> Martin Fahning ✓ SSC-Designee 8-hr H&S Refresher(exp.2/16/00) <br /> Field Technician H&S Supervisor Training <br /> MSW-]:\14214\03_Stocktonlhasp.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.