My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
2255
>
3500 - Local Oversight Program
>
PR0518431
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2018 8:54:51 AM
Creation date
10/23/2018 8:12:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0518431
PE
3528
FACILITY_ID
FA0013904
FACILITY_NAME
ZE AUTO REPAIR
STREET_NUMBER
2255
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16908055
CURRENT_STATUS
02
SITE_LOCATION
2255 S AIRPORT WAY
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> ENVIR• <br /> NRENTAL HEALTH DtPARTMENT <br /> °U'" SAN JOAQUIN COUNTY <br /> >.•' -"`SAG <br /> v_;,, ;a Donna K. Heran, R:E.H.S. <br /> Program Cnordi�iatnrs <br /> N:i:;.• f :< 304 East Weber Avenue,Third Floor Carl Borgman, R.E.H.S. <br /> ,; Director <br /> Laurie A. Cotulla,R.E.H.S. Stockton,California 95202-2708 Mike Huggins, R.E.H.S.,R.D.T. <br /> Assistant Director Telephone: (209)468-3420 Margaret io, R.E.H.S. <br /> Robert McClelllellon, R.E.H.S. <br /> Fax: (209) 464-0138 Jeff Carruesco, R.E.H.S. <br /> Website:www.sigov.org/ehd/ Kasey Foley, R.E.H.S. <br /> j ULTRAMAR INC <br /> 685 WEST THIRD STREET <br /> HANDFORD CA 93230 <br /> SAYED & ZAKIA ABDELWAHED <br /> 740 WEST OAK ST <br /> STOCKTON CA 95203 <br /> Re: ZE AUTO REPAIR(ABDELWAHED FACILITY/ULTRAMAR NO. 33792) <br /> 2255 SOUTH AIRPORT WAY <br /> STOCKTON, CA 95206 <br /> WORKPLAN: Letter Work-Plan for Remediation_System Investigation DATED; Apr 14.2006 <br /> PREPARED BY: Horizon Environmental,Inc. / ..� <br /> ❑ APPROVED (See Conditions Below) <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORKPLAN(H&S 25296.10,subd.(c)(3).): <br /> 4 Install a soil vapor extraction / air sparging remediation system on site. The work-,viU include: <br /> 1. Install one air sparge well(SW-2) to approximately 65 feet below surface grade (bsg) <br /> 2. Install subsurface piping and equipment for the remediation system. Based on the flow diagram <br /> included in the work plan: <br /> The air sparge system shall consist of two air sparge wells(SW-2 and S\V-1) to a 1.5 horse- <br /> power 7.5 cfm oil-less compressor,and the soil vapor extraction wells. <br /> The soil vapor extraction system shall consist of 4 vapor extraction wells(\7%XL1 to <br /> VW-4),a knockout drum to remove water from the extracted vapor,an extraction blower <br /> (unknown rating and capacity),and a Thermal/catalytic oxidizer rated for 250 cfm. <br /> I Obtain permits from appropriate agencies. <br /> COMMENTS AND CONDITIONS: <br /> The work plan has not included the final engineering designs including all the equipment and component <br /> selections. Horizon stated that the final design and equipment details will be prepared and submitted to <br /> permitting agencies (Task 5). EHD reserves the right to comment and approve the final design and equipment <br /> specifications. You are required to submit the final engineering design and specifications to EHD before <br /> obtaining permits from other agencies. <br /> Begin implementation of the proposed work (installation of SW-2) by October 1,2006" <br /> REASONS FOR DISAPPROVAL OF THE WORKPLAN (H&S 25296.10,subd.(c)(3).): <br /> None <br /> CDATED August 15, 2006 BY � <br /> c: CRWQCB,Central Valley Region—James L.L.Barton,PG y <br /> c: Horizon Environmental,Inc.—Rexford K. Smith,PG <br />
The URL can be used to link to this page
Your browser does not support the video tag.