Laserfiche WebLink
7. Plant required }:ealth and Safety Equipment (ie. hard hats, icng <br /> sleeve shirts, el•ewear, gloves, boots, etc.) <br /> Plastic, impact resistant hard hats, steel tees, leIather wcri <br /> ... boots, necprene boots (if required) , rubber gloves, 7yvQ k <br /> coveralls (if recuired) . <br /> t Emergency ecuip=e,-.t will include wash with hose bib onsite, <br /> t . first aid tit (located in drill rig and service vehicle), and <br /> ice for burns on drill rig or cooler. <br /> �s <br /> c 8. Safety procedures <br /> Ir <br /> Site Entry/Access <br /> 14 traffic sicns, cones* to be used. Flacrn j.x traffic warrents. <br /> 3•Sonitoring <br /> t-= <br /> pariodic air ;onitoring for benzene, t;sing Draeger diffusion <br /> �...a <br /> tabes. revel D expected. Respirators available to go Lg <br /> modified level D(with respirators) . <br /> Periodic rest (every 15-20 minutes) for heat stress, especially <br /> if Tyvek is used. Synbto:-,,s of dizziness, light-headedness, loss <br /> of perspiration ,rill be checked. Frequent breaks (at least <br /> every hour) . including partially or fully disrobing froza Tyvek, <br /> and copious water intake will be enforced. <br /> Egress <br /> not applicable <br /> r Decontamination <br /> not expected, however, augers to be stea*t cleaned between <br /> borings. <br /> 9. Special Frccedures and Precautions <br /> 'MMMISM <br />