Laserfiche WebLink
4 <br /> 1 <br /> i <br /> LSSA will be cc:ntacted. U/G utilities will be narked. facility <br /> perscnnel to ccnfirm plar.t undercrcund untilities. Plan of existing <br /> underground facilities already cbtair.ed. cvexhead lines nct a <br /> proble;s. <br /> f <br /> r . <br /> r <br /> 10. Fermissibie Expcsure Li,ndts <br /> activity Locatior, P.B. T--evel of Protect. <br /> dri l!.zng and <br /> well installaticn all hells 10 ppnTLV level D <br /> 'henzene <br /> respirators cn <br /> w rig .r/ organic <br /> �., vaporcartridce <br /> soil sa:,pling all bo,:ings 10 pn:,TLV level D <br /> henzere repirators <br /> available <br /> wzter sampling all wells 10 ppmTLV level D <br /> ire respirators <br /> available <br /> i.e 11. ContingE.;cy -I-ocedures/Training <br /> _ fs - - <br /> ,� Refer tc Section 12 for Emergency Contacts <br /> Any employee injured on the site will be immediately removed <br /> i from Cie .' ccP,taminated zone, given emergency first aid, <br /> decontaminated <br /> cif required) , and transported to Dar",exon <br /> f <br /> 3„ Hospital (if ;Medical attention is warranted) .iw . <br /> Tailgate safety neetirgs will be held at the beginning of each <br /> f working day, and at the beginning of new work activities. <br /> Eric Hubbard .has. CPR and first aid .training <br /> t y ` <br /> All team rembers have received training outlined in 29 CFR <br /> 191j.1? (40 hours plcis 8 hours supervisory) . Certificat es in <br /> personnel files indicating compliance with 29 'CFR. <br /> Medical Surveillance pro4rar, for, employees also initiated, <br /> q including respiratcr certicaticn f2:on physician. <br /> MINOR <br />