Laserfiche WebLink
1 � <br /> 7. Plant required Health and Safety Equipment (ie. hard hats, long <br /> sleeve shirts, eyewear, gloves, boots, etc. ) <br /> plastic, impact resistant hard hats, steel toes, leather work <br /> boots, neoprene boots (if required) , rubber gloves, Tyvek <br /> 1 coveralls (if required) . <br /> Emergency equipment will include wash with hose bib onsite, <br /> first aid kit (located in drill rig and service vehicle) , and <br /> ice for burns on drill rig or cooler. <br /> 8 . Safety Procedures <br /> Site Entry/Access <br /> traffic signs, cones' .to be used. Flagman if traffic warrant's. <br /> i <br /> Monitoring <br /> periodic air monitoring for benzene, using Draeger diffusion <br /> tubes. Level D expected. Respirators available to go to <br /> modified Level D(with respirators) . <br /> Periodic rest (every 15-20 minutes) for heat stress, especially <br /> if Tyvek is used. Symptoms of dizziness, light-headedness, loss <br /> of perspiration will be checked. Frequent breaks (at leajst <br /> every hour) including partially or fully disrobing from Tyvek, <br /> and copious water intake will be enforced. <br /> Egress <br /> not applicable <br /> � I <br /> Decontamination <br /> not expected, however, augers to be steam cleaned between <br /> borings. <br /> 9. Special Procedures and Precautions <br /> I <br />