Laserfiche WebLink
(lw) . <br /> i USA will be contacted. U/G utilities will be marked. Facility <br /> personnel to confirm plant underground untilities. Plan of existing <br /> underground facilities already obtained. Overhead lines not'! a <br /> problem. <br /> 10. Permissible Exposure Limits <br /> Activity Location P.E.L. Level of Protect. <br /> drilling and <br /> well installation all wells 10 ppmTLV level D <br /> benzene <br /> respirators on <br /> rig w/ organic <br /> vapor cartridge <br /> soil sampling all borings 10 ppmTLV level D <br /> .benzene repirators <br /> available <br /> water sampling all wells 10 ppmTLV level D <br /> respirators <br /> available <br /> 11. Contingency Procedures/Training <br /> Refer to Section 12 for Emergency Contacts <br /> Any employee injured on the site will be immediately removed <br /> from the contaminated zone, given emergency first aid, <br /> i decontaminated (if required) , and transported to Damer=on <br /> j Hospital (if medical "attention is warranted) . <br /> Tailgate safety meetings will be held at the beginning of each <br /> working day, and at the beginning of new work activities. <br /> Eric Hubbard has CPR and first Aid training <br /> All team members have received training outlined in 29 C.FR <br /> 1910. 12 (40 hours plus 8 hours supervisory) . certificates in <br /> personnel files indicating compliance with 29 CFR. <br /> Medical Surveillance program for employees also initiated, <br /> including respirator certication from physician. <br />