Laserfiche WebLink
4 . List of Xncwn Chi al Cc;.tcminznts: <br /> snticl ated Xax <br /> LIE Contaminant" Scarce ediva conc�rpr_ticns <br /> Total Pet Fydro casol re water <10 pp-r <br /> <100 ppb benzene <br /> Aromatics gasolir.e `.iter <br /> F� <br /> 5. List of Xncwn Physical -azards (ie. heavy traffic areas, <br /> overhead construction areas, work around excavations, work ins- <br /> ti1 buidings, etc.) <br /> Hazard Deription Location Procedures to <br /> sc <br /> t Reduce Hazard <br /> Tra;fic autos/trucks near loading signs; flagman <br /> areas <br /> utilities water, gas, eta USA marked,ccord <br /> w/ facility <br /> lifting/drop augers, sampler proper lifting, <br /> hard hats <br /> n� boots <br /> f <br /> 4 ' <br /> drilling borings to al? wells gloves, open <br /> ;' �anpling water barrel w/ care <br /> heat stress all wells 71,0 nitsigns <br /> water on rig <br /> breaks on hot <br /> days <br /> 6. Planned Site Activities (,am specific, identify personnel per <br /> J task and include expected start date of activities.) <br /> installation of 3, 55 feet deep, 2 inch diameter groundwater <br /> ronitvring wells. Perforations between 30 and 50 feet with pvc <br /> perforated and pec solid casiisg. All locations located in or <br /> just off traveled way. Although traffic is light in all ; <br /> locations, warning signs Will be posted and care should be � <br /> exercised to watch for traffic. <br /> Advancement of two to three soil borings to less than 35 feet <br /> in depth. Continous, ]•:oss sampling throughout. Split spoon <br /> Samples to ]:e obtained at 5 foot vertical iiltervals. Soil <br /> samples to be screened for volatiles wi:l1 p.i.d. <br />