Laserfiche WebLink
7. Plant recuired Fealth and Safety Eq;rigr,ent (ie. hard hats, long <br /> G3 sleeve shirts, eyewear, gloves, boots, etc. ) <br /> plastic, ir:pact --esistan` hard hats, steel toes, leather wcik <br /> boots, necprene boots (if required) , rubber gloves, Ty-vek <br /> ka coveralls (if req-aired) . <br /> t Emergencyecvig,:e,.t will include wash with hose bib onsite, <br /> first aid kit (located in drill rig and service vehicle) , and <br /> ice for burns on drill rig or cooler. <br /> [j <br /> f . <br /> f <br /> S. Safety Procedures <br /> Site Entry/Access <br /> P� <br /> I : traffic signs, cones to be used. Flag—mar. if traffic warrants.. <br /> Xonitoring <br /> periodic air :,onitor.ing ror benzene, using Draeger diffusion <br /> tubes. Level. D expected. :Respirators available to go to <br /> modified revel D(with respirators) . <br /> Periodic rest (every 1520 minutes) for heat stress, especially <br /> if Tyvek is used. synptor:s of dizziness, light-headedness, loss <br /> �. of perspiration will be checked. Frequent breaks (at least <br /> E� every hour) including partially or fully disrobing fron Tyvek, <br /> and copious water intake will be enforced. <br /> V4 <br /> l <br /> Egress <br /> not applicable <br /> l0 <br /> . Decontamination <br /> r <br /> . <br /> not expected, however, augers to be steam cleaned between <br /> # borings. <br /> 9.' special Prccedures and Precautions <br />