Laserfiche WebLink
this investigation, PSC recommended one more groundwater monitoring event <br /> be performed The event would collect groundwater samples from wells MW- <br /> 1, MW-5, MW-7, MW-8, MW-10, MW-11, MW-12, SP-1, SP-2, SP-4, SP-6, <br /> PZ-I, and PZ-2 The samples would be submitted for the analytical <br /> parameters of TPH-G, BTEX, TBA, MTBE, ETBE, TAME, and 1,2-DCA <br /> The analysis of EDB would not be performed, since It was not detected during <br /> the investigation Upon completing the next event, PSC would prepare a <br /> report and propose either site closure or additional remedial work The <br /> SJCEHD approved the recommendations In a letter dated September 24, 2004 <br /> Although, they requested that the remaining wells MW-2, MW-3, MW-4, <br /> MW-6, MW-9, and MW-13 be placed on the annual groundwater monitoring <br /> program to track the plume However, they requested that all wells remain to <br /> have their water levels and total depths be measured during each quarterly <br /> event They also requested that the following report include contaminant <br /> mass estimates and fate and transport models for dissolved gasoline and <br /> benzene <br /> 7 <br /> Quarterly Groundwater Monitoring Report <br /> October 2004 <br /> The Earthgrams Company Facility <br /> 2651 South Airport Way-Stockton California <br /> Prepared for SARA LEE BAKERY GROUP Prepared by Philip Services Corp <br /> H\ENV1624001321121382EGIStockton-Airport Wayllnvestigatton and Quarterly Reports\Quarterly Report 10_2004 doc December 09 2004 <br />