Laserfiche WebLink
21 <br />sparge test will be used during the vent/sparge test. The <br />parameters monitored during the vent test and sparge test will also <br />be monitored during the vent/sparge test at the time intervals <br />shown in attached Table 1. <br />After the test is completed groundwater samples will be <br />collected from Monitoring Well MW -1 and piezometers PZ -1 and PZ -2. <br />These samples will be analyzed for BTEX, TVH -G, and total <br />heterotrophic bacteria. <br />07/94/1213821125997/REM REP/1 July 1, 1994 9 26am <br />