Laserfiche WebLink
TABLE OF CONTENTS <br /> Fue- <br /> 1 INTRODUCTION/EXECUTIVE SUMMARY..............................................................1 <br /> 2 REMEDIAL ACTION PROCESS AND SYSTEM DESCRIPTION.............................3 <br /> 2 1 Process Criteria 3 <br /> 2 2 Process Description 3 <br /> 2 3 Air Sparging 4 <br /> 2 3 1 Sparging Compressors 4 <br /> 2 4 Soil Venting 4 <br /> 2 4 1 Venting Blowers 5 <br /> 2 5 Sparge and Vent Piping 5 <br /> 2 6 Vapor Treatment 5 <br /> 2 7 System Control Panel 6 <br /> i3 SYSTEM OPERATION AND MONITORING PROCEDURE.....................................7 <br /> 3 1 Description of Operation 7 <br /> 3 2 General System Monitonng/Maintenance 7 <br /> 3 3 Vapor Sampling and Analysis 7 <br /> 3 4 Monitoring Well Development, Sampling, and Sample Analysis 8 <br /> 3 5 Reporting 8 <br /> 3 6 Waste Management 8 <br /> 3 7 Permitting 9 <br /> 4 ESTIMATED SCHEDULE ...........................................................................................10 <br /> APPENDIX A Pilot Testing Summary <br /> APPENDIX B Proposed Remedial System Plan Drawings <br /> Final Remediation Plan <br /> Prepared for RA7[NBo BAKING COMPANY 111 Prepared by Burlington Environmental Inc <br /> E 112138211259971TESTEVAL DOC 2/1195 <br />