Laserfiche WebLink
I INTRODUCTION/EXECUTIVE SUMMARY <br /> • This Final Remediation Plan (FRP)was prepared by Burlington <br />' Environmental Inc (Burlington) for the Rambo Baking Company/Earth <br /> Grains facility at 2651 South Airport Way in Stockton, California A site <br /> location map showing this facility is included as Figure 1 Previous <br /> subsurface site investigations assessed the extent of hydrocarbon impacted <br /> soil and groundwater at the facility A summary of investigation results <br /> and subsurface conditions is presented in Burlington's April 25, 1994, <br /> Groundwater Monitoring Well Installation Report <br /> The assessment of subsurface conditions indicated that soil venting and air <br /> sparging may be effective remedial technologies for the facility Burlington <br /> performed a pilot test of these technologies to provide data necessary for <br /> the design of a full scale soil venting and air sparging remediation system <br /> Pilot test procedures were proposed in Burlington's July 1, 1994, <br /> Remediation System Pilot Test Workplan <br /> This report presents the proposed plan for a hill scale soil venting, air <br /> sparging, and soil vapor treatment remediation system Operation and <br /> monitoring procedures, and an estimated construction schedule for the <br /> remediation system are presented herein <br /> Final Remediallon Plan <br /> Prepared for RAIINBO BAKING COMPANY 1 Prepared by Burlington Environmental Inc <br />�� E 112I38211259971TESTEVAL-D0C 2/2195 <br />