My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000113
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
2651
>
3500 - Local Oversight Program
>
PR0543371
>
ARCHIVED REPORTS XR0000113
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2018 12:49:48 AM
Creation date
10/23/2018 1:18:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS XR0000113
FileName_PostFix
XR0000113
RECORD_ID
PR0543371
PE
3528
FACILITY_ID
FA0006174
FACILITY_NAME
Best Express Foods Inc.
STREET_NUMBER
2651
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16912003
CURRENT_STATUS
02
SITE_LOCATION
2651 S AIRPORT WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I INTRODUCTION/EXECUTIVE SUMMARY <br /> • This Final Remediation Plan (FRP)was prepared by Burlington <br />' Environmental Inc (Burlington) for the Rambo Baking Company/Earth <br /> Grains facility at 2651 South Airport Way in Stockton, California A site <br /> location map showing this facility is included as Figure 1 Previous <br /> subsurface site investigations assessed the extent of hydrocarbon impacted <br /> soil and groundwater at the facility A summary of investigation results <br /> and subsurface conditions is presented in Burlington's April 25, 1994, <br /> Groundwater Monitoring Well Installation Report <br /> The assessment of subsurface conditions indicated that soil venting and air <br /> sparging may be effective remedial technologies for the facility Burlington <br /> performed a pilot test of these technologies to provide data necessary for <br /> the design of a full scale soil venting and air sparging remediation system <br /> Pilot test procedures were proposed in Burlington's July 1, 1994, <br /> Remediation System Pilot Test Workplan <br /> This report presents the proposed plan for a hill scale soil venting, air <br /> sparging, and soil vapor treatment remediation system Operation and <br /> monitoring procedures, and an estimated construction schedule for the <br /> remediation system are presented herein <br /> Final Remediallon Plan <br /> Prepared for RAIINBO BAKING COMPANY 1 Prepared by Burlington Environmental Inc <br />�� E 112I38211259971TESTEVAL-D0C 2/2195 <br />
The URL can be used to link to this page
Your browser does not support the video tag.