My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000141
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
2651
>
3500 - Local Oversight Program
>
PR0543371
>
ARCHIVED REPORTS XR0000141
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2018 4:56:45 PM
Creation date
10/23/2018 1:29:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS XR0000141
FileName_PostFix
XR0000141
RECORD_ID
PR0543371
PE
3528
FACILITY_ID
FA0006174
FACILITY_NAME
Best Express Foods Inc.
STREET_NUMBER
2651
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16912003
CURRENT_STATUS
02
SITE_LOCATION
2651 S AIRPORT WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br />14 <br />n <br />0 • <br />PHILIP SERVICES <br />---- c o R P <br />L <br />HEALTH & SAFETY PLAN <br />Earthgram/Stockton <br />UST Investigation <br />2651 South Airport Way <br />Stockton, CA <br />PLAN APPROVAL NUMBER COI -199-011 DATE 04/13/99 <br />PROJECT NUMBER 125997 <br />1.0 PURPOSE <br />The purpose of thus Health and Safety Plan (HASP) is to assign responsibilities, establish <br />personnel protection standards and mandatory safety practices and procedures, and provide for <br />contingencies that may arise during site operations This Plan must be read prior to going into the <br />field to ensure proper planning (e g, availability of equipment, etc) and the "Plan Acceptance <br />Form' must be signed by applicable PSC employees <br />2 0 APPROVALS <br />Project Manager <br />Regional H&S Officer <br />3.0 FIELD PERSONNEL <br />The field team will consist of the following persons <br />Date <br />Date M11/ -3)1q7 <br />Project Manager Mark Milward, PSC -Columbia, IL <br />Site Safety Coordinator Mark Milward PSC -Columbia IL <br />PSC Field Personnel Mark Milward, PSC -Columbia, IL <br />Daryl Lamb, PSC -Columbia, IL <br />Site Health and Safety Plan <br />Eatth9mns/Stockton COL -99-011 <br />Stockton CA <br />May 15`" 1999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.