Laserfiche WebLink
40 • <br />5 0 HAZARD EVALUATION <br />A job hazard analysis (JHA) must be performed prior to beginning each new task A <br />documented hazard analysis form shows that you have considered each step of your task, the <br />Possible safety risks, and control or preventative measures JHAs for some of the site tasks <br />foreseen prior to project mobilization are included in the appendix The best person to fill out a <br />JHA is the person going to do the job, so ask the SSO for a JHA form prior to doing any new <br />work <br />Volatile organics will be the biggest exposure concern The main exposure pathways are <br />inhalation and dermal <br />5 2 EXPOSURE MONITORING <br />Exposure monitoring will X will not be required for this project as the sampling involves <br />minimal risk for exposure <br />5 3 INITIAL LEVEL OF PROTECTION <br />This project will be conducted using the following initial level of protection <br />' Level A Level B Level C Level D X <br />l� <br />Level of Protection <br />Protective Equipment Ensemble <br />D Coveralls or work clothes <br />• impermeable coveralls required when in contact with <br />waste materials or quick lime <br />- PVC, or <br />- Polycoated Tyvek, or <br />Work gloves (as needed) <br />Impermeable gloves and inner gloves required when in <br />contact with waste materials <br />- PVC (inner) <br />- Nitrile (outer) <br />Safety boots, leather, steel toe <br />• Rubber (latex) overboots for incidental contact with <br />waste materials to protect leather work boots <br />-or- <br />16 inch PVC boots with steel toe and shank for <br />extended contact <br />Site Health and Safety Plan 3 <br />Earthgrarns/Stockton, COL -99-01 I <br />Stockton CA <br />May 15"' 1999 <br />