Laserfiche WebLink
• <br />31 <br />1• <br />0 0 <br />00 <br />FIELD PERSONNEL- TRAINING AND MEDICAL REQUIREMENTS <br />Project personnel involved in initial installation of the system must meet the following <br />training/ medical requirements <br />• HAZWOPER 40 Hour Initial Training, <br />• HAZWOPER 8 Hour Refresher Training (Current- n e , within last 12 months), <br />• Medical Clearance Certificate (e g , from last annual/ biennial physical) <br />At least one on-site employee must meet the following requirements <br />• HAZWOPER S Hour Supervisor Certificate, <br />• Current certification in First And and CPR <br />Personnel using respiratory protection must meet the following requirements <br />• Respirator Flt Test Record less than 12 months old (For APR), <br />• Medical Clearance to wear a respirator (thus is normally on the Sununary Profile for the <br />annual physical) <br />4 0 PROJECT DESCRIPTION <br />The site is located at 2651 South Airport Way in Stockton, CA The work area is on the grounds of <br />a baking plant, and is mainly covered by asphalt and concrete A CPT direct -push drilling rig <br />will be used to perform borings for soli and groundwater sample collection Work is planned <br />for May 15,1999, and is expected to take 2 days <br />Site Health and Safety Plan <br />Earthgrams/Stockton COL -99-011 <br />Stockton CA <br />May 15"', 1999 <br />N <br />