Laserfiche WebLink
BP Chemical Facility (SJCEHD Site Code 2042), 3437 S. Airport Way, Stockton, CA February 3, 1993 <br /> Ms.,Margaret Lagorio, REHS 3 <br /> SOIL DISPOSAL <br /> The Corrective Action Work Plan specified that the excavated soil would be characterized and disposed <br /> of off-site. However, based on the laboratory results and the volatile nature of the contaminants, <br /> alternatives methods of treatment and disposal are being evaluated. The stockpiled soil will remain <br /> covered with plastic sheeting until an alternative disposal method is planned. <br /> SCHEDULE <br /> Groundwater Technology can begin backfilling the existing excavation immediately upon approval from- <br /> the SJCEHD. The excavation can be backfilled in one day. A final report will be prepared and <br /> submitted to the SJCEHD within 45 days of completing the excavation backfilling. That report will _ <br /> describe the backfilling operations and plans for treating and disposing of the stockpiled soil. <br /> If you .have any questions regarding this letter, please call me in our Concord, California office at (510) <br /> 671-2387. <br /> Sincerely, <br /> GROUNDWATER TECHNOLOGY, INC. <br /> { ���A'� <br /> David R. lae ` <br /> esattel, R.G. DAVig FL JUBATML <br /> District Hydrogeologist i0 S1 <br /> Project Manager <br /> F of �`�o�=• <br /> Attachments: Tables 1 and 2, Figure 1 CA <br /> cc: Mr Lon Kitagawa <br /> BP Chemical, Advanced Materials Division <br /> 3437 South Airport Way <br /> Stockton, California 95201 <br /> a <br /> LR2258A1AK <br /> ® GROUNDWATER <br /> TECHNOLOGY,INC. <br />