My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
5000
>
3500 - Local Oversight Program
>
PR0543845
>
FIELD DOCUMENTS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2020 8:28:26 AM
Creation date
10/23/2018 4:04:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
FIELD DOCUMENTS
FileName_PostFix
FILE 1
RECORD_ID
PR0543845
PE
3526
FACILITY_ID
FA0005867
FACILITY_NAME
STOCKTON METRO AIRPORT*
STREET_NUMBER
5000
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
02
SITE_LOCATION
5000 S AIRPORT WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
392
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T . <br /> Well Development and Surveying, <br /> Ah6r the four monitoring wells are completed and the well seal has had sufficient time to set <br /> fat least <br /> 72 hours), they will be properly developed by repeated surging and pumping <br /> Each of the newly installed wellheads will be surveyed by a licensed surveyor. The sureyflt. <br /> will measure the elevation of the tap of well casing to the nearest 0.0 foot; referenced to An <br /> established bench );nark: <br /> E: <br /> Disposal. of R,insate and Development 'Water <br /> 'UV`aste water generated during decontamination procedures and well devei pn ent will be stoxed ' <br /> in Sgallon drams penclitg +disposal. Depending on the concentranoas of petrol <br /> hydrocarbflns fflund in ilrre newly"'installed wells, waste water may be discharged t4 land or <br /> sanatory sewersystem. For:the purpose of this cost estimate, it is assumed that all`waste <br /> will be'disposed of as anon MCRA hazardous liquid using a vacuum truck: <br /> 'Tam 3. bite Inv+estigatidi Report <br /> IT ll report the methods and fi Odin s associated with scope of world it# a Site Invest* F. <br /> Report: Itz addition tct a standarrd discussion of methods, the report wait include the folly <br /> . ► Site location snap and site plan; <br /> Map illustrating groundwater surface and gradient; <br /> Figures depicting extent of impacted soil and groundwater; .. <br /> Boring lags and crass sections, if appropriate; <br /> Tables summarizing laboratory results. <br /> Quarterly Groundwater Sampling <br /> Beginning at least 48 hours after well development and then quarterly thereafter, groundwater <br /> from the newly installed monitoring weds should be monitored and sampled. <br /> A. Groundwater Monitoring and Sampling <br /> On a quarterly basis,IT will monitor and sample the four newly installed wells. Each well will: <br /> be inspected, measured for depth to water, purged of at least three well volumes, and sampled <br /> using laboratory-supplied containers. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.