Laserfiche WebLink
B. Laboratory Analysis of Groundwater Samples <br /> IT will submit all groundwater samples to a stag of California certified analytical laboratory for <br /> analysis. The analyses to be performed include TPH-as-aviation gasoline, 'ISH-as jet fuel, <br /> BTEX, MTBE and dissolved oxygen: <br /> C Disposal of Purged Groundwater <br /> All purged groundwater from the well sampling activities will be temporarily stored on site in <br /> 5 -gallon drums. For the purpose of this proposal, it is assumed that the water will be profiled <br /> anti manifested as non-R:CRA waste and transported for disposal by vacuum true. <br /> D. Quarterly Groundwater Monitoring Reports <br /> On a quarterly. basis, IT will prepare a groundwater monitoring reports to document the results <br /> of the quarterly groundwater monitoring and sampling activities. In addition to a standard <br /> discussion of methods and findings, each report will include a groundwater surface map, <br /> isoconcentration maps and summary data tables. <br /> COST ESTIMATE <br /> IT will perform the outlined scope of services for an estimated cost of$24,210.10 not including <br /> $2,206.10 for each quarterly groundwater sampling event. A cost estimate detail is attached. <br /> SCBEDULE <br /> Upon notice to proceed, IT will complete the project in approximately 1:4 weeks. A Gantt Chart <br /> is attached. The durations of each of the three tasks are as follows: <br /> Task 1. Preliminary Site Inspection 3 Weeks <br /> Prepare Workplan and H S Plan <br /> Obtain Permits <br /> Workplan Review by Regulatory Agency 2 Weeks <br /> Task 2. Groundwater Grab:Sampling 5 Weeks <br /> Laboratory Results <br /> Monitoring Well Installations <br /> Well Development and Surveying <br /> Task 3. Site Investigation Report 4 Weeks <br /> 5 <br />