My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
5000
>
3500 - Local Oversight Program
>
PR0543845
>
FIELD DOCUMENTS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2020 8:28:26 AM
Creation date
10/23/2018 4:04:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
FIELD DOCUMENTS
FileName_PostFix
FILE 1
RECORD_ID
PR0543845
PE
3526
FACILITY_ID
FA0005867
FACILITY_NAME
STOCKTON METRO AIRPORT*
STREET_NUMBER
5000
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
02
SITE_LOCATION
5000 S AIRPORT WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
392
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Laboratory Analysis of Groundwater Samples <br /> IT will submit all groundwater samples to a stag of California certified analytical laboratory for <br /> analysis. The analyses to be performed include TPH-as-aviation gasoline, 'ISH-as jet fuel, <br /> BTEX, MTBE and dissolved oxygen: <br /> C Disposal of Purged Groundwater <br /> All purged groundwater from the well sampling activities will be temporarily stored on site in <br /> 5 -gallon drums. For the purpose of this proposal, it is assumed that the water will be profiled <br /> anti manifested as non-R:CRA waste and transported for disposal by vacuum true. <br /> D. Quarterly Groundwater Monitoring Reports <br /> On a quarterly. basis, IT will prepare a groundwater monitoring reports to document the results <br /> of the quarterly groundwater monitoring and sampling activities. In addition to a standard <br /> discussion of methods and findings, each report will include a groundwater surface map, <br /> isoconcentration maps and summary data tables. <br /> COST ESTIMATE <br /> IT will perform the outlined scope of services for an estimated cost of$24,210.10 not including <br /> $2,206.10 for each quarterly groundwater sampling event. A cost estimate detail is attached. <br /> SCBEDULE <br /> Upon notice to proceed, IT will complete the project in approximately 1:4 weeks. A Gantt Chart <br /> is attached. The durations of each of the three tasks are as follows: <br /> Task 1. Preliminary Site Inspection 3 Weeks <br /> Prepare Workplan and H S Plan <br /> Obtain Permits <br /> Workplan Review by Regulatory Agency 2 Weeks <br /> Task 2. Groundwater Grab:Sampling 5 Weeks <br /> Laboratory Results <br /> Monitoring Well Installations <br /> Well Development and Surveying <br /> Task 3. Site Investigation Report 4 Weeks <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.