Laserfiche WebLink
During the SVE tests, the influent and effluent air stream from the SVE unit will be monitored <br /> using a PID. To confirm PID measurements and to verify the performance of the activated carbon <br /> abatement, influent and effluent sail vapor samples will be collected during each of the SVE tests, <br /> The soil vapor samples will be collected in eedlarT bags, which will be labeled and transported <br /> with chain-of-custody documentation to a state of California-certified hazardous ardous waste testing <br /> laboratory, The laboratory will analyze the soil vapor samples for T l -as-gasoline, 13TEX and <br /> MTBE by EPA Method 8020/8015M and/or 8260B. <br /> 3.3.2 Air S ar e'Test <br /> To evaluate air sp rging as a groundwater remediation alternative, Rarnage Environmental will <br /> complete an 3-hour air sparge test, Air sparging should be effective in remediating impacted <br /> groundwater and saturated soil below the groundwater table. <br /> Prior to starting the AS test, Ramage Environmental will monitor the groundwater table elevation, <br /> observation well pressure, dissolved oxygen in groundwater, and soil gas parameters (oxygen, <br /> carbon dioxide, urethane, organic vapors, oxygen reduction potential, and ferrous iron) in the <br /> observation wells MW-1, MW-3 and the throe proposed SVE wells). <br /> The AS test equipment will include a -horsepower coil-less air compressor, electric generator, <br /> air-hoses, flow gauges and multiple pressure gavages connected to air-tight well caps, During the <br /> AS test, air from the oil-loss corepressor will be injected into the air sparge test well at rates of up <br /> to 3 cfrn, and pressure readings will be collected from the test well and the observation wells, <br /> The test well and observation wells will be monitored with field instruments every hour during the <br /> 3-hour AS test, The monitoring parameters will include the groundwater table elevation, air <br /> injection pressure, operating pressure, injected air-flow rate, observation well pressure, dissolved <br /> oxygen in groundwater, and the soil gas parameters (oxygen, carbon dioxide, and organic <br /> vapors), One hour after the completion of the -hamar test, the find monitoring parameters will be <br /> measured, <br /> 3,3.3 Groundwater <br /> r�arrr lin ;for I lidrobial Anal cis <br /> To evaluate the existing subsurface microbial populations, and to evaluate monitored natural <br /> attenuation as a remedial alternative,groundwater samples will be collected from MW-1MW-1 and MW-. <br /> 3 for microbial analysis, before the air sparge test. <br />