My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
5000
>
3500 - Local Oversight Program
>
PR0543845
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2020 8:28:26 AM
Creation date
10/23/2018 4:28:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0543845
PE
3526
FACILITY_ID
FA0005867
FACILITY_NAME
STOCKTON METRO AIRPORT*
STREET_NUMBER
5000
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
02
SITE_LOCATION
5000 S AIRPORT WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The wells v 1 be purged with a pump and dedicated disposable tubing until at least three well <br /> casing volumes are removed and/or after groundwater temperature, pH and electrical conductivity <br /> values have stabilized. Groundwater will be sampled from the wells using disposable <br /> polyethylene bailers and laboratory-supplied containers. Each sample container will be <br /> transported in an iced cooler With chain-of-custody documentation to a state of California certified <br /> hazardous waste testing laboratory. The lab will analyze the two groundwater samples for <br /> dissolved oxygen,suffatelsulfitelsulfide, nitrate/nitrite, total dissolved iron, methane, magnesium, <br /> and heterotrophic plate counts. <br /> d 11:11's <br /> Storage an <br /> All waste, I soil cuttings generated during drilling will be contained in 55-gallon drums for temporary <br /> on-site storage, pending waste proffing and proper disposition. Equipm6atiosate, purged <br /> groundwater, and SVE test moisture knock-out liquid will be contained its 56-gallon drums, <br /> pending waste profifing and proper disposition. Waste activated carbon Will also be stored <br /> : <br /> temporarily on-site, until this waste can be profiled and transported off-sitefor regeneration and/or <br /> disposal. <br /> 3. ProjecttReporting <br /> -)g will be documented in a <br /> 6M.Wial f 6 lit L <br /> r , <br /> The re4offs:Of the. .: 40 y <br /> and G'604604" fid0Pltin As outlined in the Tri-Regional Board Ste,f- <br /> 7: . <br /> a.Y.6 r: re im 9 <br /> 10 R(.-,,1cOMrn.Ohd V. ns f P A �St �,.-ifions and Evaluation ofUST site A <br /> i00IYJnv6 1 <br /> L (AoYust2 200$), the Alto-CAIS vuill indlude an updated Site Conceptual Mb"(SCtv, '_-, )(Aan <br /> evr,Iuotiori ofthe remwiloll silt 61.6tives that have a substantial likelihood to achieve cleanup goals. <br /> ev <br /> The rerne tO b 81k),9ted will include soil vapor extraction, air sparlgirig. -nd <br /> a <br /> nionitord&natural Att C <br /> ation, The AP wHI propose a preferred reme,._J�h l strategy, based on <br /> ........... <br /> effectiveness,dufattoh,.cost, and site iogistics, The PAR-CAP will be prepared-and stairrt by a <br /> state,of Call.Irnlat Qeulogist or Engineer and submitted to EHD4nd R- QCB. <br /> a+ rafe-s sion <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.