• 4 <br /> 3.0 CONCLUSIONS, RECOMMENDATIONS AND PROJECT STATUS <br /> Between December 19, 2003 and March 25, 2004, the groundwater potentiometric surface rose <br /> an average of 0 88 feet Groundwater flow and gradient characteristics could not be calculated, <br /> since only two of the three monitoring wells were accessible <br /> Between December 19, 2003 and March 25, 2004, the concentrations of petroleum hydrocarbons <br /> in groundwater increased at MW-1 and decreased at MW-2 The lateral extent of impacted <br /> groundwater remains undefined <br /> On December 31, 2003, Ramage Environmental submitted to EHD, Work Plan, Additional Site <br /> Investigation On January 28, 2004, EHD requested that the work plan be expanded to further <br /> define the lateral and vertical extent of impacted soil and groundwater beneath the site On <br /> February 27, 2004, Ramage Environmental submitted Revised Work Plan On March 9, 2004, <br /> EHD approved the revised work plan Currently, implementation of the approved scope of work is <br /> pending funding authorization from the responsible parties <br /> 6 <br />