Laserfiche WebLink
al � <br />Mosquito Abatement District <br />Page 3 <br />Site Status „ <br />Following the removal of the underground storage tanks, soil contamination was <br />excavated to 27 feet below ground surface. Residual soil contamination was <br />detectedup to 12 ppm TPH. However; the' detection limits used for BTEX were too . <br />high and sidewall samples were not collected. <br />On April 13,' 1987, to verify'that the on site well was not affected by the petroleum <br />hydrocarbon'release, a sample was collected and analysis indicated that the well was <br />not. contaminated and that groundwater within the well was' noted at 28 feet below <br />ground surface. . <br />Subsequently.. two new tanks (#9 and #10) were installed in the area excavated. <br />{ <br />On December 4, 1991, a UAR and Prop 65 notification were filed'by PHSIEHD. <br />Correspondence prepared by PHSIEHD dated December 23, 1991 informed you that, <br />a UAR was fled and that additional investigation of the site was required. <br />On February 3, 1994, you were notified that,a work plan to install monitoring wells <br />and to continue the soil investigation should be submitted. In July 1994, seven soil <br />boring were 'drilled,three of which were converted into monitoring wells and two were <br />continued to, allow the collection of groundwater samples using a hydropunch. The <br />results from this investigation indicated that there was possible residual soil <br />contamination in the area of former tanks #1, #2 and #4. <br />In order to confirm that groundwater has not been impacted, additional groundwater <br />monitoring and sampling should be scheduled by March 31, 1995. ' <br />As 'PHS/EHD requested during the recent meeting, a summary' of all the prior soil and, <br />groundwater analytical results from the tank removals, over -excavation, soil borings, <br />groundwater monitoring wells and hydropunches should be prepared and submitted <br />immediately. A corrective action plan estimating the volume and concentration of <br />residual soil contamination should be submitted by May 15, 1995.- As you indicated, <br />the District is evaluating the necessity of retaining use of tanks #9 and #10.' If these <br />tanks are removed, it will likely occur sometime between April and June 1995 and at <br />that time additional remedial investigation will occur. r <br />If you have any questions or to schedule a site inspection to witness sampling, <br />please contact Mary Meays at (209) 4168-0337. { <br />Donna Heran, RENS, Director <br />Environmental Health Division <br />Mary Meays, Senior REHS:' Diane M. Hinson, REHS <br />Site Mitigation Unit Supervisor <br />MM/MOSQUITO <br />cc: Elizabeth Thayer, Central Valley Regional Water Quality Control Board <br />