My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
8020
>
2900 - Site Mitigation Program
>
PR0538970
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2018 3:20:46 PM
Creation date
10/24/2018 1:13:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0538970
PE
2953
FACILITY_ID
FA0022382
FACILITY_NAME
STOCKTON CSMS
STREET_NUMBER
8020
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
8020 S AIRPORT WAY
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Provide a cost estimate (per sample) for co 1 cting and analyzing 2 soil samples from below <br /> the area with contaminated soil. Send the sa p�es to a California-certified laboratory for quick <br /> turnaround analysis. Analyses should include "PH-diesel (EPA 8015) and SVOC (EPA 8270). <br /> 4. Ensure the EHD inspector is notified of the start time and date of the clean-up work, and <br /> invited to observe the work. If possible, excavate contaminated soil to the extent considered <br /> satisfactory by the inspector(see County EHD Inspection Report 17 April 2014). Contaminated <br /> soil will be placed in 55-gallon drums available onsite. Waste-filled drums will be scheduled by <br /> the CSMS for pickup and disposal by the CA RNG hazardous waste disposal contractor. <br /> 5. Stage the drums in the area designated by the CSMS shop supervisor(Ryan Kinney) or his <br /> onsite representative, after all soil excavation is complete, and soil-filled drums are sealed. <br /> Pending sample analyses,temporarily place barriers, drums or cones around the excavated area. <br /> 6. Fill-in the excavated area with clean fill material and smooth out the area,after the soil sample <br /> results confine there is no fuel residue. Up to 21 cubic yards of backfill material may be required <br /> to fill in the excavated area(see the attached Photo#1 Spill Area and Photo#3 Rocky Soil). <br /> 7. Prepare a brief report(electronic draft and 2 hard copy final reports) summarizing the clean-up <br /> activities and showing analytical data for soil samples,to serve as a record of fuel spill clean-up <br /> completion. The final report will be submitted to the County EHD to receive a case closure letter. <br />
The URL can be used to link to this page
Your browser does not support the video tag.