Laserfiche WebLink
KLEINFELDER <br /> Specialties facility, we request they provide that list in order to incorporate into <br /> this sampling and analysis task: <br /> • Total Dissolved Solids(TDS)by SM 2540C,Hold time 7 days, <br /> • Fixed Dissolved Solids (FDS)by SM 2540C, Hold time 7 days, <br /> • Volatile Dissolved Solids by SM 2540C, E, Hold time 7 days, <br /> • Biochemical Oxygen Demand (BOD)by EPA Method 405.1, Hold time 2 days, <br /> • Nitrate as Nitrogen by EPA Method 300.0, Hold time 2 days, 28 days when preserved, <br /> • Sodium by EPA Method 200.7, Hold time 6 months, <br /> • Chloride by EPA Method 300.0, Hold time 6 months, <br /> • Total Kjeldahl Nitrogen (TKN) by EPA Method 351.4, Hold time 28 days <br /> • Electrical Conductance(EC)by SM 25106, Hold time 24 hours, and <br /> • pH by SM 5330B, D, Hold time immediate. <br /> The water samples will be secured under chain of custody control protocols and <br /> analyzed by a laboratory certified to perform the analyses. The water samples will be <br /> analyzed on an expedited turn around schedule requiring up to 5 working days. <br /> Task 2 — Reporting- <br /> Kleinfelder <br /> eportingKleinfelder will submit a report with our findings of the sampling results to Pulte. The <br /> report will include a description of all field activities, lithologic logs, sampling logs, <br /> sample chain of custody form, certified laboratory reports, and a graphical <br /> representation of the sample locations. <br /> ANTICIPATED SCHEDULE <br /> We anticipate Task 1 to require approximately 3 weeks to complete once approved to <br /> proceed. The report of findings will be prepared approximately 2 week following the <br /> receipt of analytical data. <br /> The following table outlines the tasks and anticipated timeframe to complete the tasks. <br /> Task Description Time Frame <br /> Task 1 Permit*, Geoprobe advancement, Sampling. 3 weeks <br /> Task 2 Reporting 2 weeks following the <br /> completion of Task 1 <br /> Kleinfelder has no control over the time required by a regulatory agency to review and approve a <br /> workplan and permit applications. <br /> 59830.1-1021ST06R1055/JDZ:ly Page 5 of 5 <br /> ©2006 Kleinfelder, Inc. October 16,2006 <br />