Laserfiche WebLink
—MAY. 1 , ;u 9 8 1�. _ l ah���1 f,3 6 c:.6 8. <br /> f <br /> e 4 <br /> 2. The iamples will be retained in the sample liners with the ends covered 1 <br /> with:aluminum fail or TeflonlD sheets and plastics end caps. If a split <br /> spoon sampler is used, clean brass liners will be inserted into the <br /> sampler prior to lowering the sampler to the bottom of the borehole. <br /> The sampler will be driven into the undisturbed soil ahead of the lead <br /> auge r by repeatedly dropping a 140-1b rammer with a 30-inch drop on <br /> the drill rods connected to the split spoon sampler. The sampler with its <br /> sample will be retrieved once the sampler is driven 18-inches into the <br /> undisturbed soil or refusal is encountered(i.e.,the sampler advances less <br /> than,6 inches over 50 drops of the hammer). If a 5-tt core barrel is used, C <br /> a sulI)sample will be collected from the core by pushing or driving a <br /> 2-itr,h diameter brass liner into the core until both ends of the liner are <br /> f l le 3 with sample_ <br /> 3.2 Soil Boring!and Soil Sampling Using a Geoprobe,Stratoprobe or Equivalent <br /> Hydraulic-Push and'Vibratory Rig <br /> Shallow soil borings(Le,, generally less than 30 ft)may be advanced and sampled using r <br /> a truck-mounted Geoprobe or Stratoprobe rig which uses hydraulic pressure and L <br /> sometimes vibratory eneMv to advance and sample subsurface soils. Samples of the <br /> subsurface:oils will be continuously cored using a 2-inch O.D.,4-ft long, tubular steel <br /> sampler. Sail samples will be retained in the sampler in 1.75-inch diameter,46-inch <br /> long,transparent acetate liners. Each sample drive is about 4 ft in length, and sampling <br /> is performed in consecutive, 4-ft intervals. <br /> The foliowiag procedures will be used for collecting soil samples using a Geoprobe <br /> (or similar)rig: <br /> 1. Prior to sampling,the Geoprobe soil sampler will be steam cleaned or <br /> thoroughly washed with a solution of Alconox or non-phosphate TSP <br /> and,double rinsed with potable water. The sample liners will be new <br /> from the factory in their original shipping carton, and will not require <br /> washing. <br /> 2. Selected soil P <br /> samples collected at various depths will be retained in the <br /> p <br /> saniple liners(the sample liner containing the desired sample will be out <br /> into a 12-inch or shorter length with a clean knife blade or clean <br /> hacksaw blade), and the ends covered with TefionO sheets and plastic <br /> end;caps. <br /> 3.3 Borehole Abandonment Procedures <br /> After the soil samples have been collected from each soil boring,the boreholes not used <br /> for well construction will be pressure grouted to the surface using RegenesisOP ORC <br /> cement. T11e cement will be pumped into the borcbole using a high pressure, horizontal <br /> injector teal_ <br /> 1 <br /> 402 331-98 63 A-2 <br />