My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
26250
>
2900 - Site Mitigation Program
>
PR0506525
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2018 9:18:19 PM
Creation date
10/24/2018 2:10:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0506525
PE
2960
FACILITY_ID
FA0007475
FACILITY_NAME
MCMULLIN DEHYDRATOR STATION
STREET_NUMBER
26250
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
MANTECA
Zip
95336
APN
25703010
CURRENT_STATUS
01
SITE_LOCATION
26250 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�AY. I <br /> 4.0 GROUNDWATER INSTALLA17ON AND SAMPLING <br /> 4.1 Borehole Advancement for Well Installation* <br /> Boreholes,for monitoring well installation will be advanced and sampled using a hollow- <br /> stem auger rig as described in Sections 3.1. The boreholes for the monitoring wells will <br /> be drilled to a depth of approximately 20 feet and to a depth of about 27 feet for the <br /> extension well provided a continuous aquitard is not encountered- If an aquitard(i.e..a <br /> stiff clay layer)is encountered below the water table and is not found to contain elevated <br /> levels of petroleum hydrocarbons using field screening method(e.g.,PID meter and/or <br /> TPH field1test kit), then the vertical continuity of this clay later will be verified by <br /> sampling,Ind advancing the borehole 5 feet_ If the clay layer is found to be greater than <br /> 5 feet thick, the clay will be considered a continuous confining layer and the borehole <br /> will be plugged with bentonite or cement grout to the top of the clay. The monitoring <br /> wells willithen be completed in the portion of the saturated zone overlying the clay layer. <br /> if the clay layer is found to be less than 5 feet thick,the clay will be considered a <br /> localized clay lens and the borehole will be advanced to the target depth. <br /> 4.2 Groundwater Monitoring for Well Installiation <br /> The grouitdwater wells will be constructed Using either 2-inch or 4-inch I.D. casing and <br /> screen(see Figure A-1,Typical Well Construction Details). <br /> The 2-inch X.D.monitoring wells will be constructed of Schedule 40 or 80 PVC casing <br /> and well screen with 0.02-'inch slots. The proper lengths of screen and blanc:casing will <br /> be steam cleaned and threaded above the ground prior to lowering inside the borehole. <br /> The well screen will be about 15 ft in length and will extend across the water table <br /> surface. :"lie bottom of the screened interval will be fitted with an end plug and the top <br /> of the well casing will be equipped with an expandable,watertight, locking cap. The <br /> annular space between the 2-inch well screen and the wall of the borehole will be filled <br /> with clear! Lonestar No. 2112 or 2/16 sand to provide filtration capacity and impede <br /> movemen'',of sand or silt into the well. The sandpack will extend from the bottom of the <br /> borehole to about I foot above the top of the well screen. A I-ft thick plug of hydrated <br /> bentonite,will be placed above the sandpack and the remaining annular space will be <br /> backiflled-with a neat cement grout containing 5% powdered bentonite. <br /> The grour;dwater extraction well will be constructed of Schedule 80 PVC easing and <br /> well screen with 0.02- inch slots. The well will be constructed in a manner similar to <br /> the monitoring wells,however, the well screen will be 20 ft long with a 2 ft sump (see <br /> Figure A-I for additional details). <br /> The wells?will be protected from vandalism or the entry of surface fluids. Each well will <br /> be finished with either a locking standpipe or a watertight, security traffic box. <br /> 4.3 Well Deviaiopment Procedures <br /> The wellsiwill be partially developed during well completion by surging and bailing <br /> water front the wells after installation of the sandpack by prior to installing the well seal. <br /> The purpcse of this partial well development is to promote settlement of the sandpack <br /> 402 331-96 63 A-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.