My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
26250
>
2900 - Site Mitigation Program
>
PR0506525
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2018 9:18:19 PM
Creation date
10/24/2018 2:10:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0506525
PE
2960
FACILITY_ID
FA0007475
FACILITY_NAME
MCMULLIN DEHYDRATOR STATION
STREET_NUMBER
26250
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
MANTECA
Zip
95336
APN
25703010
CURRENT_STATUS
01
SITE_LOCATION
26250 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MA 7. 3. 19 0, 10, G511M S+G��6Goa1 ;�t�. C 1 <br /> HEALTH AND SAFETY PLAN <br /> Pacific Gas and Electric Cor pany is dedicated to ensuring that its employees and contractors work <br /> 1 within a safe and healthy environment at potentially hazardous sites. All field personnel working on the <br /> project will be SARA-traine;i-(Hazardous Waste Site Operations 40-hour training class). This Health <br /> I and Safety Plan is prepared in accordance with 29 CFA 1910.126 and will be implemented during the <br /> soil and groundwater sampling portions of the remediation project described in this workplan. The <br /> requirements,specifications.;and procedures presented in this plan will apply to all on-site personnel <br /> involved in this investigatioil including employees,contractors and sub-cantractors,site visitors, and <br /> regulatory agency personnel <br /> KEY PERSONNEL <br /> The Site Safety Officer/Project Manager will provide necessary raining to site personnel involved in the <br /> proposed field activities in the use of safety and personal protection equipment and will manage the on-site <br /> monitoring program. The Site Safety Officer/Project Manager will have the authority to deny access to any <br /> individual without the proper,training,medical release,or protective equipment required for the site <br /> conditions or those individuals disregarding site safety procedures. All site personnel will be under the <br /> direction of the Site Safety 0fficer/Project Manager. The Site Safety OfficerlProject Manager for this <br /> project at PG&E`s McMullin;Gas Dehydrator Station is Darrell Klingman (phone: $10-866-5883, <br /> pager: 510-448-3623)or Eric:Johnson(phone: 510-866-5888, pager: 51 539-1910), <br /> HAZARD A1VALYUS <br /> The activities addressed by alis health and safety plan include soil sampling while conducting exploratory <br /> soil borings, well installatimand development,and the collection of groundwater samples from monitoring <br /> wells. Although exposure to chemical contaminants at hazardous levels is very unlikely,these activities <br /> present a remote potential foj+exposure to potentially hazardous substances via ingestion,dermal contact, <br /> and inhalation. For this Health and Safety Plan,the chemicals of concern are petroleum hydrocarbon <br /> compounds(e.g.,gasoline and diesel-range hydrocarbons)and aromatic compounds(e.g.,benzene,toluene, <br /> ethylbenzene and xylenes). <br /> The most significant risk associated with the compounds at the site is exposure to aromatic compounds. <br /> Skin contact will be eliminated by use of clothing and gloves. The inhalation hazard will be minimized by <br /> 402331-9863 g_1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.