My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0079674
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
IDAHO
>
2103
>
4200/4300 - Liquid Waste/Water Well Permits
>
SR0079674
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2018 3:48:26 PM
Creation date
10/25/2018 1:38:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200/4300 - Liquid Waste/Water Well Permits
RECORD_ID
SR0079674
PE
4210
STREET_NUMBER
2103
Direction
N
STREET_NAME
IDAHO
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
12110035
ENTERED_DATE
9/21/2018 12:00:00 AM
SITE_LOCATION
2103 N IDAHO AVE
QC Status
Approved
Scanner
DAfonskaia
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ng existing upper and lower mounting tabs. Install float switch at desired activation level. Remove screw from front of lower cover.Lift bottom of lower cover out slightly. <br /> a usando las lenguetas de montaje superiores a inferiores. Instalar el interrupter de flotador al nivel de activaci6n deseado. 3Slide lower cover down until it is clear of the upper cover and remove.Determine <br /> 2conduit-in"location on alarm.See bottom of enclosure for cord placement <br /> indicator marks.Drill holes for conduit entry. <br /> Retire el tornillo de la parte frontal de la cubierta inferior.Levante ligeramente el fondo-de la cubierta <br /> inferior.Deslice la cubierta inferior hacia abajo hasta que se separe de la cubierta superior y retirela. <br /> Determine la ubicaci6n de"entrada de conducto"en la alarma.Vea la parte inferior de la carcasa para <br /> ver las marcas del indicador de coiocaci6n del cable.Perfore agujeros para la entrada del conducto. <br /> B A A <br /> C <br /> a <br /> C <br /> #� B <br /> s,. <br /> G <br /> wer cable through conduit and wire to 7 position Restore power and check alarm operation after installation(high level Test alarm weekly to insure proper operation. <br /> ground wire to ground termination post, 5 application shown). Probar la alarma semanalmeme para comprobar su buen funclonamiento. <br /> event moisture or gas from entering enclosuire. Restablecer la alimentaci6n y verificar el funcionamiento de la alarma despues de la instalaci6n <br /> e flotador y el cable de alimentaci6n a traves del conducto y (se ilustra la aplicaci6n de nivel alto). <br /> ales de 7 posiciones.Conectar el cable a tierra al borne de la toma a <br /> os para evitar la entrada de gases o humedad al gabinete. <br /> TANK ALERV EZ • • Wiringr • • <br /> CAI-dr,de la Ahima FANK ALFRT`EZ DUO <br /> A S M T W TH F S <br /> Au Mary Float I A ■■M■■■■ <br /> B� eo A <br /> ■■0■1M, AAW, 119, MENEEME <br /> ■■■ <br /> F <br /> O <br /> X A <br /> O <br />
The URL can be used to link to this page
Your browser does not support the video tag.