Laserfiche WebLink
Frorn: LARRY SHEPHERD To: Steve Sasson Date. 712M9 Time: 3:58:14 PM Page 9 of 16 <br />6.0 Air Monitoring Plait <br />Due to the nature of the chemicals on site and the scope of the <br />operations, air monitoring will be conducted to prevent any build up <br />of volatile hydrocarbons that may be an explosive hazard. The <br />contractor will conduct monitoring, using a direct reading from a <br />combustible gas indicator, periodically during the course of the <br />operation. Lower explosive levels will be maintained below 10%. If <br />LEL readings at anytime exceed 10%, work will be stopped and all <br />personnel evacuated until acceptable LEL readings are obtained. <br />f,. I Con. fined ,Sjiace Entry <br />All activities related to the entry of the tank will be conducted <br />in accordance with the underground tank entry procedures contained <br />in the fluid Containment Service Manual. Containment Solutions will <br />provide the safety observer. C.L Bryant will arrange with The City Of <br />Tracy Fire Dept. to be ready to respond in cases they are needed. <br />7.0 Safety Equipment <br />a. Fire truck <br />b. First aid team <br />c. Ambulance (if requested) <br />The area dispatcher for these organizations will be <br />notified of the times and dates that the work will be done. <br />