Laserfiche WebLink
Double Wall Tank Monitoring <br />Because of its superior leak detection capability, Fluid <br />Containment recommends the Hydrostatic Tank Monitor. <br />However, the tank owner and/or operator is responsible for <br />selection of monitoring system. <br />B 1. Alternate Tank Monitoring Systems <br />• A variety of leak monitoring systems can be used with <br />Fluid Containment double-wall tanks. <br />• Alternate tank monitoring sensor must be located at the <br />monitoring fitting on top of tank. <br />4" Monitoring Fitting <br />Fiberglass Reservoir` <br />& 4" Hydrostatic Monitoring Fitting <br />'Tank Model OWT-Type II Only <br />Restrictions on Monitoring Capabilities <br />(All Fluid Containment Double -Wall Tanks) <br />• For liquid sensors and gasoline vapor sensors: <br />❑ Cavity between the inner and outer tank may be ei- <br />ther vented to the atmosphere or sealed. <br />Restrictions on Monitoring Capabilities <br />(Type 1I Tanks Only) <br />• For Hydrostatic Tank Monitor: <br />❑ Tank burial depth must not exceed 7' from tank top <br />to finish grade. <br />❑ Monitoring cavity between the inner and outer <br />tank must be vented to the atmosphere. If <br />unvented, pressure buildup can cause tank dam- <br />age. <br />❑ Optional reservoir sensor (supplied by Fluid Con- <br />tainment) senses liquid level in reservoir and auto- <br />matically vents monitoring cavity. <br />• For Vacuum Monitoring: <br />❑ Maximum vacuum is 5 psi. <br />• For Positive Air Pressure Monitoring: <br />C3 Maximum air pressure is 5 psi. <br />132. Installation of Liquid or Vapor Sensors <br />• Consult monitoring equipment manufacturer for proper <br />installation. <br />• When liquid or vapor sensors are used, the tank may be <br />sloped at time of installation. <br />• If tank is sloped, place tank so that the lowest elevation <br />is at monitoring end. <br />• Use an electrician's wire puller to position sensor at or <br />near bottom of tank. Most sensors can be installed from <br />Finished grade. <br />Important: For ease of installation insert the sensor in <br />the tank cavity before installing the monitoring riser pipe <br />to grade. <br />Note: Fluid Containment recommends minimum 4" riser <br />to grade for ease of removal or replacement of sensor. <br />Install <br />Liquid or Vapor <br />Sensors Here <br />High End 4' Monitoring Fitting Low End <br />of Tank of Tank <br />Fiberglass Reservoir' <br />&4 <br />" Hydrostatic Monitoring Fitting <br />Optional <br />2" Slope <br />Maximum t <br />Liquid or Vapor Sensors <br />Tank Model DWT -Type II Ony <br />Tank <br />Diameter <br />Clearance Between <br />Inner and Outer Tanks <br />41 <br />1 ., <br />6' <br />7/8" <br />8' <br />7/8" <br />of <br />l-1/2" <br />133. Installation of Vacuum or Air <br />Pressure Monitoring Systems <br />• Consult monitoring equipment manufacturer for proper <br />installation. <br />134. Installation of Hydrostatic Tank <br />Monitor <br />• See section C for detailed installation instructions. <br />13 <br />