Laserfiche WebLink
From: LARRY SHEPHERD To: Steve sasson Date 6130!99 Time: 8:17:04 AM Page 9 of 25 <br />outer ware O.e. coveralls) should be removed before leaving the <br />site. <br />10 I Tank disposal <br />Once the tanks have been removed they will be shipped <br />using proper shipping manifest to the factories yard in <br />Bakersfield, Ca. The lOk-gallon tank «gill only be shipped 1 -fit <br />is unable to retain to it- s proper roundness. While in die yard <br />they will be repaired and brought back to CIL standards. There <br />Will be DTSC' tank closure certification form supplied to the <br />inspector once the LEI, levels have been measured prior to <br />removing the tank. <br />ll. 0 Waste Handling and Dispasrrl <br />Waste materials that might be implemented during this <br />operation such as salvage drums will be collected and disposed <br />of properly_ Rinse solution will be put in to salvage drums and <br />removed boom the site by Clearwater Lnvironmental. <br />12.0 Emergency Response -1 Contingency pl., <br />12.1 personal injurtr <br />In case of minor injury general first aid procedures will be <br />applied. All injuries -will be reported to the Site Safe., ORicer. <br />More serious injuries will require assistance from paramedic. <br />The project supervisor, safety- officer, or another designated <br />person will contact the appropriate emergency personnel by <br />dialing 911 if they are not already on stand-by at the scene. <br />Maps illustrating the location of the nearest hospital are <br />located in Appendix B <br />12.3 Elle and Skin Exposure <br />