Laserfiche WebLink
From: LARRY SHEPHERD To: Steve sasson Date: 6130/99 Time: a:17:04 AM Page S of 25 <br />7.1 personrrel Protective Equipment (PPE) <br />a. Steel toed shoes <br />b. Hard hat <br />c. Safety classes <br />d. Gloves, leather for material bandling <br />Other PPF: may be required depending on changes made in the <br />field <br />8. 0 Training <br />All personnel who may be associated with the tank removal <br />activities must provide documentation of the fallowing <br />A. Updated certificates for various equipment training <br />B. Project- specific training will be providing at the site before <br />tank removal into the UST. <br />C. The contents of the Health and Safety Plan have been <br />reviewed by each site worker <br />D. A discussion of the health and safety hazards, protective <br />measures, and work practices - <br />9. 0 <br />ractices. <br />9.0 Medical Surveillance <br />No pre -work medical examine is necessary <br />10.0 Decontamination <br />Decontamination involves the orderly, controlled removal of <br />contaminants. Tank residue contained petroleum, Which can be <br />easily r+ernoved by washing with soap and water. Contaminated <br />