My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
574
>
2300 - Underground Storage Tank Program
>
PR0231405
>
COMPLIANCE INFO 2008 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 11:06:01 AM
Creation date
10/29/2018 11:24:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO 2008 - 2011
FileName_PostFix
2008 - 2011
RECORD_ID
PR0231405
PE
2361
FACILITY_ID
FA0003164
FACILITY_NAME
A ONE GAS & FOOD
STREET_NUMBER
574
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
574 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ACDEH,August 2003 Page of <br /> 4. TANK ANNULAR TESTING <br /> Test Method Developed By: ❑Tank Manufacturer Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure Vacuum Hydrostatic <br /> ❑Other(Spec) <br /> LTest;Equiprnent Used:0-30" Hg Vacuum Gauge Equipment Resolution: <br /> Tank# —En Tank# Tank# Tank# <br /> Is Tank Exempt From Testing?1 ❑Yes b(No ❑Yes ONO ❑Yes ❑No ❑Yes ❑No <br /> Tank Capacity: <br /> Tank Material: — <br /> Tank Manufacturer: ? ? <br /> Product Stored: 1 <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(RO: l <br /> Test End Time: 1:3 <br /> FinalReading(RF): .. , <br /> Test Duration: <br /> Change in Reading(RF-R): D <br /> Pass/Fail Threshold or Criteria: —� <br /> Test Result: Pass ❑Fail ,e Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? c0'Yes []No ❑NA 8 Yes ❑No [INA ❑Yes ❑No ❑NA ❑Yes []No ❑NA <br /> Was sensor properly replaced and <br /> verified functional after testi n ? Yes ❑No ❑NA [jYes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Comments—(include in ormation on repairs made prior to testing, and recommendedfollow-up for, ailed tests) <br /> ' Secondary containment systems where the continuous monitoring automatically monitors both the <br /> containment,such as systems that are hydrostatically monitored or under constant vacuum, <br /> Primary and secondary <br /> testing, {California Code of Regulations,Title 23,Section 2637 a 6 are exempt from periodic containment <br />
The URL can be used to link to this page
Your browser does not support the video tag.