My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
574
>
2300 - Underground Storage Tank Program
>
PR0231405
>
COMPLIANCE INFO 2008 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 11:06:01 AM
Creation date
10/29/2018 11:24:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO 2008 - 2011
FileName_PostFix
2008 - 2011
RECORD_ID
PR0231405
PE
2361
FACILITY_ID
FA0003164
FACILITY_NAME
A ONE GAS & FOOD
STREET_NUMBER
574
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
574 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ACDEH,August 2003 Page of <br /> 5. SECONDARY PIPL TESTING <br /> "Test Method Developed By: ❑Piping Manufacturer Industry Standard 13 Professional Engineer <br /> Ll Other(Spec) <br /> Test Method Used: Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used:0-15 PSI Gauge Equipment Resolution: <br /> Piping Run# Piping Run# Piping Run# 3 Piping Run#L} <br /> Piping Material: 1=AJC <br /> V <br /> Piping Manufacturer: Yz „ N <br /> Piping Diameter: l } 5 <br /> Length of Piping Run: <br /> Product Stored: Ci l <br /> Method and location of <br /> i in -run isolation: (CAJU <br /> Wait time between applying <br /> pressure/vacuum/waterand <br /> starting test: . <br /> Test Start Time: <br /> Initial Reading(RI): v V <br /> 'S v <br /> Test End Time: g- l,� <br /> Final Reading(RF): t 5 _ <br /> Test Duration: lhmt <br /> Change in Reading(RF-R,): _,J —0 <br /> Pass/Fail Threshold or D <br /> Criteria: �� `v <br /> Test Result: -E t Pass ❑Fail 4 Pass ❑Fail .W-Pass []Fail Pass ❑ Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> -� Fn.Z <br />
The URL can be used to link to this page
Your browser does not support the video tag.