Laserfiche WebLink
1 <br /> t <br /> ACDEH,August 2003 <br /> _ Page of <br /> 8. FILL RISER CONTAINMENT SUMP TESTING <br /> Facility is Not E uipped With Fill Riser Containment Sum <br /> Test Method Developed By: <br /> El Sump Manufacturer ❑Indus Standard <br /> ' ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure <br /> ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used:In-Con TS-STS <br /> Equipment Resolution: <br /> Fill Sump# Fill Sump# Fill Sump# Fill Sum <br /> Sum Diameter: p# <br /> Sum De the <br /> Height from Tank Top to Top of <br /> Hi est PinjRg Penetration: <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: <br /> Condition of sump prior to <br /> testing: <br /> Depth of Sump Tested <br /> Sump Material: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> startin test: <br /> Test Start Time: <br /> Initial Reading(RT): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading <br /> Pass/Fail Threshold or Criteria: <br /> Test Result: ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Is there a sensor in the sump? ❑Yes ❑No ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Does the sensor alarm when ❑Yes ❑NO ❑YeS ❑No ❑Yes ❑No <br /> either product or water is ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> detected? ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor removed for testing? ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and <br /> verified functional after testin ? ❑YeS ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Comments—(include information on re airs made prior to testing, and recommended follow-u or failed tests) <br /> L1 <br />