Laserfiche WebLink
ACDEH,August 2003 Page of <br /> 7. UNDER-DISPENSER CONTAINMENT C TESTING <br /> Test Method Developed By: ❑UDC Manufacturer ❑Industry Standard Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used:In-Con TS-STS Equipment Resolution: <br /> UDC# 1- UDC#3-c4 UDC# UDC#--7- <br /> UDC Manufacturer: gra v <br /> UDC Material: P 44 <br /> UDC Total De the30• 4 <br /> Height from UDC Bottom to Top <br /> 30 <br /> of Highest Piping Penetration: 4 `L{ (b' <br /> Height from UDC Bottom to <br /> Lowest Electrical Penetration: C15, <br /> Condition of UDC prior to <br /> testing: OAS, <br /> Depth of UDC Tested p <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both VYes ❑No ❑NA VYes ❑No ❑NA f Yes ❑No ❑NA iYes ❑NqLJNA <br /> product and water)?* <br /> Turbine shutdown response time <br /> Is system programmed for fail- <br /> safe shutdown?* /Yes ❑No ❑NA $(Yes ❑No ❑NA j1 Yes ❑No ❑NA 4Y. ❑No ❑NA <br /> Was fail-safe verified to be <br /> o eional?' ❑Yes XNo ❑NA ❑Yes OKo ❑NA ❑Yes 04011NA 11 Yes �No ❑NA <br /> rat <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test <br /> Test Start Time: y,, I <br /> Initial Readin (R,): k <br /> Test End Time: � � 'Z� <br /> Final—Reading(RF): `t l <br /> Test Duration: I-C <br /> IV�1 .. ► M wJl M,U► <br /> Change in Readin (RF-RI): _ is — .. <br /> _Q <br /> Pass/Fail Threshold or Criteria: _ <br /> Test Result: Pass ❑Fail -a Pass ❑Fail A-Pass ❑Fail A Pass ❑Fail <br /> Was sensor removed for testing? es ❑No ❑NA 14-Yes11No [INA �1 Yes ❑No ❑NA <br /> Was sensor properly replaced a KYes ❑No ❑NA <br /> vaps'd fimatiewl after testing? 4 Yes ❑No ❑NA 4&es ❑No ❑NA ®-Yes ❑No ❑NA C-Yes ❑No ❑NA <br /> Comments-(include information on repairs made prior to testing, and recommendedfollow-up or failed tests) <br />