Laserfiche WebLink
— Campbell Taggart Inc. December 14, 1990 <br /> 202/029000-390 Page 8 <br /> involvement and local guidelines, volume of impacted soil,original microbial population,weather conditions, <br /> original motor-oil concentrations, moisture levels, and pH. As a result, Groundwater Technology can not <br /> guarantee completion within the estimated time period. <br /> 9.0 CONCLUSIONS <br /> Groundwater Technology has been successfully applying bioremediation technology for the past <br /> nine years, both above ground and in situ. This work plan presents bioremediation as the recommended <br /> remedial action based on a review of applicable options. <br /> We appreciate the opportunity to respond to the needs of Campbell-Taggart, Inc. with regards to <br /> the Stockton Rainbo facility. Please contact Groundwater Technology's West Sacramento Office if you have <br /> questions. <br /> -JIV GROUNDWATER <br /> TECHNOLOGY, INC. <br />