Laserfiche WebLink
r <br /> AASC Cleaning Center Pit <br /> 11. Bi-Weekly: <br /> Inspections: <br /> This inspection will take place on every other Friday <br /> (except holidays & designated plant shutdowns) and will <br /> be in addition to the daily inspection tasks. <br /> I. Check floor coating for signs of cracks, or peeling that <br /> would allow liquid to penetrate the protective barrier. <br /> 2. Check floor and sump for dirt/debris accumulation. <br /> m` Lift floor grating where necessary to view all sections. <br /> 3. Check anchoring snugness of pH treatment tank and <br /> associated parts to ensure they are secure. <br /> 9` Corrective Actions: <br /> 1. If cracks are observed, notify maintenance supervisor <br /> and Lon Kitagawa immediately and arrangements will <br /> be made to repair coating. <br /> 01 2. Sweep up or vacuum debris and appropriately dispose <br /> ... as hazardous waste. <br /> � 3. Use appropriate tools to tighten loose hardware. <br /> - EIVED <br /> 3s, <br /> 26 2017 <br /> ' L ENVIRONytENTAL <br /> ridi?� HEALS i 1 DEPARTMENT <br /> ENVIRONME AL DEPARTMENT Revised:"6/12/2017 <br />