My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUTO PLAZA
>
3400
>
2200 - Hazardous Waste Program
>
PR0514278
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2019 12:39:53 PM
Creation date
10/31/2018 9:41:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0514278
PE
2228
FACILITY_ID
FA0010308
FACILITY_NAME
TRACY CHEVROLET
STREET_NUMBER
3400
STREET_NAME
AUTO PLAZA
STREET_TYPE
WAY
City
TRACY
Zip
95376
APN
21227011
CURRENT_STATUS
01
SITE_LOCATION
3400 AUTO PLAZA WAY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
FRuiz
Supplemental fields
FilePath
\MIGRATIONS\A\AUTO PLAZA\3400\PR0514278\COMPLIANCE INFO 2001- 2017.PDF
QuestysFileName
COMPLIANCE INFO 2001- 2017
QuestysRecordDate
7/19/2018 3:46:14 PM
QuestysRecordID
3944121
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
305
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12 February 2018 AdvantedGeo <br /> AGE Project No. 11-1934 Environmental <br /> Page 4 of 5 <br /> 4.0. HYDROSTATIC TEST <br /> The hydrostatic test [22CCR§66265.192(k)(10)] is conducted to verify the AST primary <br /> and secondary shell will not leak. The test was conducted by representatives of AGE on <br /> 09 January 2018. Test results are provided in Table 4. <br /> 4.1. HYDROSTATIC TEST PROCEDURE <br /> The six AST primary and secondary compartment ports are temporarily sealed to <br /> maintain an inner constant pressure. A regulator with pressure valve was attached to one <br /> opening of the primary and secondary AST compartment. Air pressure was applied with <br /> a compressor ranging between approximately 2.5 pounds per square inch (psi) and 3 psi; <br /> first to the primary and then to the secondary. The approximate AST ports and respective <br /> locations are shown on Figure 3. <br /> 4.2. HYDROSTATIC TEST RESULTS <br /> The hydrostatic test results indicated both the primary and secondary AST shells did not <br /> leak at the time of the test. Pressure readings were collected every fifteen minutes for <br /> one hour from the primary. Testing of the secondary followed successful results from the <br /> primary tank test. No fluctuation in pressure was recorded during the test. Test results <br /> are provided in Table 4. <br /> 5.0. SEISMIC ANALYSIS <br /> A seismic analysis is provided to verify the AST will not tip or turn over during a seismic <br /> event. Seismic data used in the calculation is included as Appendix A. The calculations <br /> are included as Appendix A. <br /> 5.1. SEISMIC CALCULATION <br /> The seismic analysis is calculated by using AST specifications and finding the horizontal <br /> shear, the overturn moment and the safety factor the AST will withstand during a seismic <br /> event. Seismic data used in the calculation is included as Appendix A. The calculations <br /> are included as Appendix A. <br /> 5.1.1. AST Specifications <br /> The 480-gallon AST primary and secondary compartment materials of manufacture are <br /> discussed in Sections 2.1.3 and 3.1. The AST weighs of 1,001 pounds (Ibs) when empty <br /> is calculated, by extrapolation, using a similar use AST. Waste oil is temporarily stored <br />
The URL can be used to link to this page
Your browser does not support the video tag.